Quick answers
What is this project?
Proposed commercial building construction project Shreeji Business Hub by Shreeji Investors is a proposed building project in Jamnagar, Jamnagar Rural, Gujarat. The site covers 4 acres.
Who is building it?
The applicant is Shreeji Investors.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jamnagar, Jamnagar Rural, Gujarat.
How big is it?
It has a stated cost of ₹42.9 crore and a site of 4 acres.
When was it filed?
The application was filed on 26 Aug 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 12 Oct 2026 |
| Application filed | 26 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shreeji Investors |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹42.9 crore |
| Village / locality | Jamnagar |
| Taluk / tehsil | Jamnagar Rural |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11808 |
In context
11 applications in Jamnagar since January 2022 are in the same category (Buildings & townships): 6 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. At 4 acres, this one is smaller than 64% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamnagar, Jamnagar Rural, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Cum Commercial Project proposed by K P Builders — environmental approval granted, 1.4 km away
- Proposed commercial building construction project Business Bay II by… — under environmental review, 2 km away
- Proposed commercial building construction project Business Bay II by Shri Jay… — environmental approval granted, 2 km away
- Mixed-Use Buildings (Shops + Residential units) by M/s. Highwoods Infraspace… — under environmental review, 3.1 km away
- Permission for Laying of 100 Mm Dia , 150 Mm Dia and 250mm Dia Water Pipeline… — lapsed, 4.1 km away
- Shri Dineshkumar Bavanjibhai Vasoya — lapsed, 4.4 km away
- Shri Dineshkumar Bavanjibhai Vasoya — cleared for impact study, 4.4 km away
- Shri Feroz Hussain Patani — lapsed, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.