Quick answers
What is Satya Oliva?
Satya Oliva is a proposed building project in Koba, Gandhinagar, Gujarat. The site covers 1.2 acres.
Who is building it?
The applicant is S R Realty.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Koba, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹95 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 22 Oct 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 22 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | S R Realty |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹95 crore |
| Village / locality | Koba |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11843 |
What the filings say
What is planned
S. R. Realty proposes to develop a mixed-use residential and commercial project named Satya Oliva in Koba, Gandhinagar. The applicant's project report describes a development consisting of four blocks (A, B, C, and D) with a total built-up area of 44,613.71 square metres.
The project is planned to include 163 residential units and 26 commercial shops. The residential component is specified as 3-BHK units. The buildings are designed with three basement levels for parking, a ground floor (hollow plinth), and 14 upper floors.
| Item | Detail |
|---|---|
| Total Plot Area | 5,032.00 square metres (0.5 hectares) |
| Total Built-up Area | 44,613.71 square metres |
| Total FSI Area | 24,177.37 square metres |
| Residential Units | 163 (3-BHK) |
| Commercial Units | 26 shops |
| Tallest Building | 14 floors above ground |
| Basements | 3 levels |
| Parking Area | 12,631.27 square metres |
Layout and design
The layout features four interconnected blocks arranged around a central foyer system. Blocks A and B share a foyer area, as do Blocks C and D. Each block is equipped with multiple lifts, including dedicated fire lifts. The ground floor is designed for commercial shops and a hollow plinth for parking.
Access to the site is provided via a 6.0-metre wide approach road. The site is bordered by a 90.0-metre wide widening road and 12.0-metre wide service roads. Internal movement includes 1:12 slope pathways for pedestrians and a 6.32-metre wide ramp for basement access. A common plot of 577.48 square metres is designated within the layout.
Land and surroundings
The project is located on Final Plot no. (184+185)/2 of Draft Town Planning Scheme no. 3 (Kudasan-Koba). The site is currently open land and does not involve the clearance of existing buildings or vegetation, except for one existing tree for which compensatory plantation is proposed. The surrounding area is within the Gandhinagar Municipal Corporation (GMC) limits and is characterized by developing residential and commercial uses. The nearest railway station is Gandhinagar, approximately 9.2 km away, and Ahmedabad Airport is about 8.1 km from the site.
Water, power and access
Water requirement for the construction phase is estimated at 30 kilolitres per day (KLD). During operation, the total water demand is projected at 174 KLD on the first day, reducing to a fresh water requirement of 120 KLD thereafter as treated water is recycled. Water will be sourced from the GMC.
Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL), with a demand of 30 kW during construction and 3.0 MW during the operational phase. A diesel generator set is planned for emergency backup.
Parking is provided across three basements and the hollow plinth, totaling 518 Car Parking Spaces (CPS), which exceeds the requirement of 325 CPS calculated under local regulations.
Environmental safeguards
The applicant proposes to treat 154 KLD of sewage in an on-site Sewage Treatment Plant (STP). From this, 54 KLD will be reused for flushing and gardening, while the remaining 100 KLD will be discharged into the GMC drainage network. For solid waste, an Organic Waste Converter (OWC) will process approximately 293 kg per day of wet biodegradable waste into manure for the greenbelt. Dry waste (239 kg per day) will be collected by the municipal body.
Rainwater harvesting will be managed through percolation wells to recharge ground aquifers. The project includes a greenbelt area of 740.53 square metres (approximately 14.7% of the plot), consisting of 351.33 square metres of tree cover and 389.2 square metres of lawn. Fire safety measures include a hydrant system, sprinklers in the basements, fire extinguishers, and an underground water storage tank.
Satya Oliva site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 62% of them.
205 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Koba, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Eldoris by Sarthak — environmental approval granted, 300 m away
- Revanta Lakeview — environmental approval granted, 300 m away
- <apple Green 3> — environmental approval granted, 350 m away
- Apple Green 3 — environmental approval granted, 350 m away
- Apple Green 3 — returned to applicant, 350 m away
- "Apple Green 3" — environmental approval granted, 350 m away
- Proposed Residential Project - "Soham Prospera" — environmental approval granted, 550 m away
- Tree Top — environmental approval granted, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.