What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Ahmadabad, Gujarat

Pearl Prarambh

Pearl Prarambh is a proposed mixed-use project in Vatva, Daskroi, Ahmadabad, Gujarat. It plans 209 units in 4 towers of up to 12 floors on 1.2 acres. Its stated project cost is ₹45.3 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 5 Nov 2026).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusUnder environmental review
Status since5 Nov 2026
Application filed13 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShiv Infra
UseMixed use
Units209
Towers4
Floors (tallest)12
Basements1
Parking spaces302
Land area1.2 acres (0.5 ha)
Built-up area22,916 m² (2,46,666 sq ft)
Plot area4,985 m² (53,658 sq ft)
Project cost₹45.3 crore
Village / localityVatva
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11954

What the filings say

What is planned

Shiv Infra proposes the construction of Pearl Prarambh, a mixed-use residential and commercial development in Vatva, Ahmedabad. The project is planned on a plot area of 4,985 square metres (1.23 acres) and will consist of four blocks (A, B, C, and D) with a maximum height of a basement, ground floor, and 12 upper floors.

The development includes a total of 209 units, comprising 192 residential apartments and 17 commercial shops. The residential units are distributed across all four blocks from the 1st to the 12th floors, with each floor typically housing four units per block. The commercial component is located on the ground floor.

Building Configuration

BlockGround Floor UseUpper Floors (1-12)Total Residential Units
Block AFoyer, Equipment Room, Meter RoomResidential48
Block BFoyer, Equipment Room, Meter RoomResidential48
Block CFoyer, Equipment Room, Meter RoomResidential48
Block DFoyer, 17 ShopsResidential48

Layout and design

The layout plan specifies a total built-up area of 22,916 square metres. The ground floor is designed to accommodate essential services including an electric meter room, equipment rooms, and a security cabin. A dedicated space of 17.02 square metres is allocated for an electric compact sub-station.

Vertical circulation will be provided by eight lifts in total, with two lifts per block (one passenger lift and one fire lift). For fire safety, refuge areas are designated on the 5th, 7th, and 11th floors. The project includes a basement for parking and additional ground-level parking areas.

Land and surroundings

The project site is located at Final Plot No. 313/1 of Town Planning Scheme No. 128 (Vatva - Aslali). The applicant has planned for 701.65 square metres (14.08% of the plot area) of greenbelt development. This includes 501.65 square metres of lawn area and 200 square metres for tree plantation. The planting program involves 130 trees of species such as Asopalav, Neem, Gulmohar, and Pipal.

Water, power and access

The project's water management strategy includes a proposed Sewage Treatment Plant (STP) with a capacity of 150 kilolitres per day (KLD). Treated sewage will be reused for gardening and flushing within the premises, with the surplus discharged into the Ahmedabad Municipal Corporation (AMC) drainage line.

Rainwater harvesting will be implemented through two percolating wells and a collection system. For power, the applicant proposes a 70 kW rooftop solar system, requiring approximately 700 square metres of terrace space. A Diesel Generator (DG) set with an acoustic enclosure will be installed for emergency backup. Access to the site is provided via an 18.00-metre wide Town Planning Scheme road, with internal roads ranging from 6.00 to 7.50 metres in width.

Environmental safeguards

The Environmental Management Plan (EMP) outlines measures for dust suppression during construction, including 15-foot high barricading and water sprinkling. During the operation phase, an automatic Organic Waste Converter (OWC) with a capacity of 248 kg/day will be used to treat wet waste on-site. The applicant has allocated a capital budget of ₹267.00 lakh for environmental management during the operation phase, which includes fire and safety systems, solar energy, and the STP.

Under Corporate Environment Responsibility (CER), the applicant has proposed a budget of ₹91.00 lakh over three years. Planned activities include providing solar rooftop systems for Gram Panchayats and post offices, and the installation of percolating wells in nearby villages such as Gamdi, Chosar, and Devdi.

Pearl Prarambh site plan and layout

A drawing from the project's filings. Sign in free to see it.

Pearl Prarambh: Layout plan: four blocks, parking areas, internal roads, and greenbelt zones (preview)🔒 Sign in free to see it
Layout plan: four blocks, parking areas, internal roads, and greenbelt zones

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.2 acres, this one is smaller than 72% of them.

132 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Vatva, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.