LapsedPower · Gandhinagar, Gujarat

To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE U/G cable having route 66 KV (220KV) Chhatral SS to 66 KV Chhatral GIDC-III SS Line (600 Mtr (1C X 630Sq.mm [(6+1)], Ta: Gandhinagar District: -Gandhinagar in Gujarat State

To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE U/G cable having route 66 KV (220KV) Chhatral SS to 66 KV Chhatral GIDC-III SS Line (600 Mtr (1C X 630Sq.mm [(6+1)], Ta: Gandhinagar District: -Gandhinagar in Gujarat State is a lapsed power project in Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 0.7 acres. Its stated project cost is ₹2.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 28 Apr 2026).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE U/G cable having route 66 KV (220KV) Chhatral SS to 66 KV Chhatral GIDC-III SS Line (600 Mtr (1C X 630Sq.mm [(6+1)], Ta: Gandhinagar District: -Gandhinagar in Gujarat State is a lapsed power project in Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 0.7 acres.

Who is building it?

The applicant is Gujarat Energy Transmission Corporation Limited.

Has it been approved?

No. The application was lapsed on 28 Apr 2026, so it is no longer under consideration.

Where is it?

In Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹2.8 crore; a site of 0.7 acres and 720 m² of forest land.

When was it filed?

The application was filed on 6 Feb 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE…

Project details

StatusLapsed
Status since28 Apr 2026
Application filed6 Feb 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantGujarat Energy Transmission Corporation Limited
Land area2,900 m²
Forest land720 m²
Project cost₹2.8 crore
Village / localityChhatral
Taluk / tehsilKalol Gandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12012

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Jun 2025Forest land use approved0.7 acres₹2.8 crore
New project filed 6 Feb 2025 (this page)Lapsed0.7 acres₹2.8 crore

In context

8 applications in Gandhinagar since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.

73 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Gujarat Energy Transmission Corporation Limited in Gandhinagar

3 Gujarat Energy Transmission Corporation projects in Gandhinagar
All 38 Gujarat Energy Transmission Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.