Quick answers
What is this project?
To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE U/G cable having route 66 KV (220KV) Chhatral SS to 66 KV Chhatral GIDC-III SS Line (600 Mtr (1C X 630Sq.mm [(6+1)], Ta: Gandhinagar District: -Gandhinagar in Gujarat State is a lapsed power project in Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
No. The application was lapsed on 28 Apr 2026, so it is no longer under consideration.
Where is it?
In Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹2.8 crore; a site of 0.7 acres and 720 m² of forest land.
When was it filed?
The application was filed on 6 Feb 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly Aluminum XLPE…
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Apr 2026 |
| Application filed | 6 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 2,900 m² |
| Forest land | 720 m² |
| Project cost | ₹2.8 crore |
| Village / locality | Chhatral |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12012 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Jun 2025 | Forest land use approved | 0.7 acres | ₹2.8 crore |
| New project filed 6 Feb 2025 (this page) | Lapsed | 0.7 acres | ₹2.8 crore |
In context
8 applications in Gandhinagar since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
73 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhatral, Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- To Grant the permission of 0.072 ha Protected Forest land for 66 KV Poly… — forest land use approved, 0 m away
- Industrial project by Divine Tubes Pvt. Ltd — more information requested, 850 m away
- Project by Bhugan Life Science Pvt. Ltd. — initial checks, 1.1 km away
- Industrial project by M/s. Ananta Fine Chem — under environmental review, 1.1 km away
- Crystal India Chemicals — environmental approval granted, 1.1 km away
- Crystal India Chemicals — cleared for impact study, 1.1 km away
- Industrial project by JVKA Industries Pvt Ltd. — initial checks, 1.1 km away
- Industrial project by JVKA Industries Pvt Ltd. — environmental approval granted, 1.1 km away
More from Gujarat Energy Transmission Corporation Limited in Gandhinagar
- To Grant the permission of 0.126 ha Protected Forest land for 66 KV XLPE U/G… — forest land use approved
3 Gujarat Energy Transmission Corporation projects in Gandhinagar
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.