Quick answers
What is this project?
220KV S/C on D/C Tower Line from 400/220KV Khambhaliya GIS to Avaada Energy Pvt. Ltd.(AEPL) Generation Pooling Station At Laluka is an approved power project in Tathiya, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Avaada Energy Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 Jan 2026), as of 27 Nov 2026.
Where is it?
In Tathiya, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹30.2 crore; a site of 0.7 acres and 460 m² of forest land.
When was it filed?
The application was filed on 20 Aug 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 6 Jan 2026 |
| Application filed | 20 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Energy Private Limited |
| Land area | 2,800 m² |
| Forest land | 460 m² |
| Project cost | ₹30.2 crore |
| Village / locality | Tathiya |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12051 |
In context
21 applications in Devbhumi Dwarka since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.7 acres, this one is smaller than 83% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tathiya, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land i.e. roadside plantation declared as… — forest land use approved, 400 m away
- Diversion of Protected Forest Land i.e. roadside plantation declared as… — lapsed, 400 m away
- Diversion of 0.0305 Ha Social Forest land for Laying of 66KV LILO Bhankhokhari… — lapsed, 2.4 km away
- Shri Maldebhai Devanandbhai Kholani Re-appraisal Area-1.00.00 Survey no.- 375… — environmental approval granted, 3.1 km away
- Shri Shihora Abhay (Gunda Black Trap Block- 1) — lapsed, 9.5 km away
- Shri Shihora Abhay (Gunda Black Trap Block- 2) — lapsed, 9.6 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Jamnagar,… — lapsed, 9.9 km away
- Diversion of 0.7476 ha Forest land for Laying of 66kV S/C Bhadthar-Ramnagar… — under forest review, 9.9 km away
All 3 Avaada Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.