Quick answers
What is this project?
Request for Change in User Agency Name from Adani Cementation Limited (ACL) to Ambuja Cements Limited pursuant to NCLT order for Diversion of 2.6564Ha. of Forest land falling within conveyor alignment between proposed Limestone Mine and Clinkerisation plant at villages Maldo & Mudhvay and between Clinkerisation plant and Berthing Jetty in Kori Creek at Villages Kapurasi and Koriyani, Kachchh, Gujarat is a lapsed industrial project in Kapurasi, Lakhpat, Kachchh, Gujarat. The site covers 6.6 acres.
Who is building it?
The applicant is Ambuja Cements Limited.
Has it been approved?
No. The application was lapsed on 14 Sept 2026, so it is no longer under consideration.
Where is it?
In Kapurasi, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹1.3 crore; a site of 6.6 acres and 6.6 acres (2.7 ha) of forest land.
When was it filed?
The application was filed on 27 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Sept 2026 |
| Application filed | 27 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Ambuja Cements Limited |
| Land area | 6.6 acres (2.7 ha) |
| Forest land | 6.6 acres (2.7 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Kapurasi |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12078 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 6.6 acres, this one is smaller than 82% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kapurasi, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Captive Jetty, Desalination Plant With Intake and Outfall and Related… — under coastal review, 2.5 km away
- Captive Jetty, Desalination Plant with Intake and Outfall and Related… — cleared for impact study, 2.5 km away
- Transfer of ToR/Change in Name subsequent to NCLT Order from Adani Cementation… — cleared for impact study, 2.7 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — more information requested, 2.9 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — environmental approval granted, 3.2 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — cleared for impact study, 3.2 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — withdrawn, 3.2 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — returned to applicant, 3.2 km away
More from Ambuja Cements Limited in Kachchh
- Captive Jetty, Desalination Plant With Intake and Outfall and Related… — under coastal review
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — more information requested
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — under environmental review
- Transfer of ToR/Change in Name subsequent to NCLT Order from Adani Cementation… — cleared for impact study
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — lapsed
- Transfer of Environment Clearance for Jadua Limestone Mining Project of M/s… — lapsed
13 Ambuja Cements projects in Kachchh
All 87 Ambuja Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.