Quick answers
What is Proposed Kishorpura to Dhansura Steel Pipeline Connectivity?
Proposed Kishorpura to Dhansura Steel Pipeline Connectivity is an approved pipeline project in Antisara, Dhansura, Aravalli, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Sabarmati Gas LTD.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Mar 2025), as of 27 Nov 2026.
Where is it?
In Antisara, Dhansura, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹1 crore; a site of 1.5 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 23 Aug 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Mar 2025 |
| Application filed | 23 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹1 crore |
| Village / locality | Antisara |
| Taluk / tehsil | Dhansura |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12138 |
In context
14 applications in Aravalli since January 2022 are in the same category (Pipelines): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 1.5 acres, this one is smaller than 54% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Antisara, Dhansura, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Major Bridge on Mazum River at Himatnagar - Ranasan - Dhansura Road Ch. 29/500… — lapsed, 2.3 km away
- Laying of 125/90 mm Dia MDPE Gas Pipeline of Ramos to Kisharpura, Dhansura to… — under forest review, 5.2 km away
- Hardik K Patel ( Butal Black Trap Lease Area 02.55.37 Ha) — lapsed, 7.3 km away
- Prafulkumar B Patel Moti Vav Black trap Quarry Area for an area 03.30.00 Hect.… — under environmental review, 8.4 km away
- M/s. Devdhan Quarry Works — withdrawn, 8.5 km away
- M/s. Dharati Quarry — not approved, 8.9 km away
- Thakor Meet Rajendrasinh , Borvai Blacktrap Quarry Area for an area 02.30.00Hect — lapsed, 9 km away
- M/s Rachana Infrastructure Limited , Moti Vav Blacktrap Quarry Area for an… — lapsed, 9 km away
More from Sabarmati Gas LTD in Aravalli
- 4" Dia Steel Pipeline For Balaji Wafers Pipeline Connectivity in Dhansura Taluka — more information requested
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity and Vinayak & Janki… — more information requested
- Laying of 4" & 8" Dia Steel Pipeline For Akshar CNG Station Connectivity,… — more information requested
- Dehgam to Bayad to Dhansura Steel Pipeline Connectivity — forest land use approved
- Laying of 12" Dia Steel Gas Pipeline from Idar to Bhiloda Steel Pipeline… — lapsed
- Idar to Bhiloda Steel Pipeline Connectivity — more information requested
8 Sabarmati Gas projects in Aravalli
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.