Quick answers
What is this project?
Diversion of 0.0675 ha. PF Land for laying of 33 kV overhead windmill transmission line for Wind Power Project from villages Chher Moti and Chher Nani to Chhuger Sub Station, Ta. Lakhpat, Dist. Kachchh is an approved building project in Chher Nani, Lakhpat, Kachchh, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Sitac Kabini Renewables Private Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Feb 2024), as of 27 Nov 2026.
Where is it?
In Chher Nani, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹2 lakh; a site of 0.2 acres and 680 m² of forest land.
When was it filed?
The application was filed on 16 May 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Feb 2024 |
| Application filed | 16 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sitac Kabini Renewables Private Limited |
| Land area | 700 m² |
| Forest land | 680 m² |
| Project cost | ₹2 lakh |
| Village / locality | Chher Nani |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12170 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.2 acres, this one is smaller than 93% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chher Nani, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — cleared for impact study, 750 m away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — withdrawn, 2.6 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — returned to applicant, 2.6 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — environmental approval granted, 2.9 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — cleared for impact study, 2.9 km away
- Diversion of 2.22 ha Forest land for Proposed Conveyor Belt Corridor by Shree… — lapsed, 3 km away
- Diversion of 3.5877 ha Forest land for Conveyor Belt Corridor by Shree Cement… — lapsed, 3.1 km away
- Diversion of 3.561 ha of Forest land for the proposed Conveyor Belt Corridor… — more information requested, 3.1 km away
More from Sitac Kabini Renewables Private Limited in Kachchh
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.