Quick answers
What is this project?
Approach road to connect proposed Gujarat Gas CNG Pump along SH-21(Botad-Paliyad road) is an approved road project in Targhara, Botad, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is Shri Botad Taluka Sahakari Kharid Vechan Sangh.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Dec 2025), as of 27 Nov 2026.
Where is it?
In Targhara, Botad, Gujarat.
How big is it?
It has a stated cost of ₹15 lakh; a site of 0.1 acres and 380 m² of forest land.
When was it filed?
The application was filed on 1 Dec 2025.
Project details
| Official title | approach road to connect proposed Gujarat Gas CNG Pump along SH-21(Botad-Paliyad road) in village Targhara, Taluka Botad, District Botad |
|---|---|
| Status | Forest land use approved |
| Status since | 20 Dec 2025 |
| Application filed | 1 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Shri Botad Taluka Sahakari Kharid Vechan Sangh |
| Land area | 400 m² |
| Forest land | 380 m² |
| Project cost | ₹15 lakh |
| Village / locality | Targhara |
| Taluk / tehsil | Botad |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12171 |
In context
6 applications in Botad since January 2022 are in the same category (Roads & highways): 3 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Targhara, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Design, Construction and O & M of Water Treatment Plant of 1250 M3/Hr.… — forest land use approved, 4.9 km away
- Baldevbhai Bhanjibhai Sorathiya — more information requested, 6.1 km away
- Shri Mala Nileshbhai Bhanubhai Dhankaniya Block-A — environmental approval granted, 6.8 km away
- Shri Mala Nileshbhai Bhanubhai Dhankaniya Block-A — cleared for impact study, 6.8 km away
- Shri Khodabhai Popatbhai Kalathiya ( Dhankaniya Blacktrap Mine ) — environmental approval granted, 6.8 km away
- Shri Khavad Bhabhalubhai Bhikubhai.Dhankaniya Block- B — environmental approval granted, 6.8 km away
- Shri Khavad Bhabhalubhai Bhikubhai.Dhankaniya Block- B — cleared for impact study, 6.8 km away
- Kalathiya Khodabhai Popatbhai — returned to applicant, 6.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.