More information requestedPipelines · Kachchh, Gujarat

Diversion of Forest Land for the Laying of Proposed Underground Water Pipeline in Favor of Senior Manager, Gwil-Anjar of Kutch District of the State of Gujarat.

Diversion of Forest Land for the Laying of Proposed Underground Water Pipeline in Favor of Senior Manager, Gwil-Anjar of Kutch District of the State of Gujarat is a proposed pipeline project in Deshalpar, Mundra, Kachchh, Gujarat. The site covers 9.8 acres. Its stated project cost is ₹342 crore. As of 27 Nov 2026, its status is “More information requested” (since 9 Nov 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land for the Laying of Proposed Underground Water Pipeline in Favor of Senior Manager, Gwil-Anjar of Kutch District of the State of Gujarat is a proposed pipeline project in Deshalpar, Mundra, Kachchh, Gujarat. The site covers 9.8 acres.

Who is building it?

The applicant is Gujarat Water Infrastructure Limited.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Deshalpar, Mundra, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹342 crore; a site of 9.8 acres and 9.8 acres (4 ha) of forest land.

When was it filed?

The application was filed on 16 Apr 2026.

Project details

StatusMore information requested
Status since9 Nov 2026
Application filed16 Apr 2026
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantGujarat Water Infrastructure Limited
Land area9.8 acres (4 ha)
Forest land9.8 acres (4 ha)
Project cost₹342 crore
Village / localityDeshalpar
Taluk / tehsilMundra
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12250

In context

59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 9.8 acres, this one is larger than 76% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Deshalpar, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.