Quick answers
What is this project?
Diversion of (Area-0.95.00 Ha.) for construction and development of Shree BhidBhanjan Hanumanji Temple Gram Vikas Trust Village Sakariya Taluka Modasa of District Aravalli is a lapsed building project in Sakariya, Modasa, Aravalli, Gujarat. The site covers 2.3 acres.
Who is building it?
The applicant is Hemant Patel.
Has it been approved?
No. The application was lapsed on 5 Oct 2023, so it is no longer under consideration.
Where is it?
In Sakariya, Modasa, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹2.5 crore; a site of 2.3 acres and 2.3 acres (1 ha) of forest land.
When was it filed?
The application was filed on 12 May 2023.
Project details
| Official title | Proposal for Diversion of (Area-0.95.00 Ha.) for construction and development of Shree BhidBhanjan Hanumanji Temple Gram Vikas Trust Village Sakariya Taluka Modasa of District Aravalli. |
|---|---|
| Status | Lapsed |
| Status since | 5 Oct 2023 |
| Application filed | 12 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hemant Patel |
| Land area | 2.3 acres (1 ha) |
| Forest land | 2.3 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Sakariya |
| Taluk / tehsil | Modasa |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12273 |
In context
5 applications in Aravalli since January 2022 are in the same category (Buildings & townships): 0 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sakariya, Modasa, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying 500 mm dia drinking water Pipeline by Nagar Palika Modasa. — lapsed, 4.9 km away
- Laying of 125/90/63 mm Día MDPE Gas Pipeline Sabalpur, Sakariya & Volva… — more information requested, 5.3 km away
- Laying of 125 mm Dia MDPE Gas Pipeline Connectivity For Re-Route DRS Coco To… — more information requested, 5.3 km away
- Modasa Underground Drainage Project — lapsed, 5.9 km away
- Modasa Underground Drainage Project — lapsed, 5.9 km away
- Proposal of Protected Forest Land 0.0815 Ha to use from Revenue Survey No. 368 — more information requested, 8 km away
- Laying of 4" & 8" Dia Steel Pipeline For Akshar CNG Station Connectivity,… — more information requested, 8.2 km away
- Laying of 4" & 8" Dia Steel Pipeline For Akshar CNG Station Connectivity,… — lapsed, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.