Quick answers
What is this project?
125/90/63/32 mm Dia MDPE Gas Pipeline Connectivity for 19 Villages Ta: Gandevi, Chikhali, Khergam &Navsari, Dist: Navsari is an approved pipeline project in Bodvank, 0, Navsari, Gujarat. The site covers 2.4 acres.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Jun 2025), as of 27 Nov 2026.
Where is it?
In Bodvank, 0, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 19 Feb 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Jun 2025 |
| Application filed | 19 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Bodvank |
| Taluk / tehsil | 0 |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12362 |
In context
22 applications in Navsari since January 2022 are in the same category (Pipelines): 14 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.4 acres, this one is larger than 90% of them.
68 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bodvank, 0, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Reappraisal of the EC granted by DEIAA Navsari for Blacktrap Quarry Mining… — not approved, 1.4 km away
- Krishna Metal(1.64.85) — not approved, 1.5 km away
- Smt .Parvatiben Ishvarbhai Dhimmar — withdrawn, 1.7 km away
- Shree Vishwa Stone Quarry (Chasa Blacktrap Mine) — not approved, 1.7 km away
- Diversion of 8.9852 ha. PF Land for Widening and Strengthening of Kharel –… — more information requested, 2.3 km away
- Chasa Blacktrap Mining Project [Survey No. 738 Paiki] — environmental approval granted, 3.2 km away
- Chasa Blacktrap Mining Project [Survey No. 738 Paiki] — lapsed, 3.2 km away
- M/s Stone World Corporation ( Chasa Blacktrap Quarry Area_1.61.36 ) — not approved, 3.2 km away
More from Gujarat Gas Limited in Navsari
- Gas Distribution Network in Chikhli Taluka & Surrounding Area Connectivity,… — more information requested
- Diversion of 0.1294 HA. of PF land for Matvad village connectivity, Ta:… — more information requested
- Diversion of 0.2529 Ha. of Protected Forest Land I.E., Road Side Strip… — more information requested
- Diversion of 0.0290 Ha. of Protected Forest Land for Laying of 4" Dia. Steel… — more information requested
- Diversion of 0.2337 Ha. of Protected Forest Land I.E. Road Side Strip… — more information requested
- 125 mm dia. PE Network Extension Required for Dream Petroleum CNG Connectivity… — forest land use approved
19 Gujarat Gas projects in Navsari
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.