Quick answers
What is this project?
Laying of 66 kV 630 SQMM (2+1) XLPE U/G cable In transmission line from Keshod (GETCO) Sub station to Maliya hatina (Railway traction substation) is an approved building project in Malia, Malia Hatina, Junagadh, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Ministry of Railways.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 May 2026), as of 27 Nov 2026.
Where is it?
In Malia, Malia Hatina, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹10.2 crore; a site of 0.3 acres and 1,090 m² of forest land.
When was it filed?
The application was filed on 12 Apr 2024.
Project details
| Official title | Laying of 66 kV 630 SQMM (2+1) XLPE U/G cable In transmission line from Keshod (GETCO) Sub station to Maliya hatina (Railway traction substation) in Village.: Maliya hatina , (Taluka: Maliya hatina & Dist.: Junagadh). |
|---|---|
| Status | Forest land use approved |
| Status since | 6 May 2026 |
| Application filed | 12 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ministry of Railways |
| Land area | 1,100 m² |
| Forest land | 1,090 m² |
| Project cost | ₹10.2 crore |
| Village / locality | Malia |
| Taluk / tehsil | Malia Hatina |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12405 |
In context
21 applications in Junagadh since January 2022 are in the same category (Buildings & townships): 8 approved, 9 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 0.3 acres, this one is smaller than 80% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malia, Malia Hatina, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Krishna Stone Crusher,c/O Mansinh Popatbhai Lakhani — environmental approval granted, 2 km away
- Shri Sindhav Pathu Bhikhubhai — environmental approval granted, 3.6 km away
- Sindhav Satishkumar K — environmental approval granted, 4.3 km away
- Sumalben Ghanshyambhai Sisodiya — withdrawn, 5.6 km away
- Smt Sumalben Ghanshyambhai Sisodiya — environmental approval granted, 5.7 km away
- EC Transfer for Bhanduri Limestone Mine in Survey No. 57 admeasuring 10.6938… — under environmental review, 6.3 km away
- M/s GHCL Limited. Production Expansion — environmental approval granted, 6.3 km away
- M/s GHCL Limited. Production Expansion — cleared for impact study, 6.3 km away
More from Ministry of Railways in Junagadh
- Laying of 66 KV cable 630 SQMM (2+1) XLPE U/G cable from Shapur (GETCO) S/S to… — more information requested
All 23 Ministry of Railways projects across India