Quick answers
What is this project?
Diversion of 0.0135 Ha. Protected Forest Land to Construct of Approach Road Through the Declared Road Side Protected Forest Area of Bhuj-Mundra Road in Favour of Repono PVT LTD is a proposed road project in Beraja, Mundra, Kachchh, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Repono Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Beraja, Mundra, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹15 crore; a site of 0 acres and 140 m² of forest land.
When was it filed?
The application was filed on 27 Mar 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Sept 2026 |
| Application filed | 27 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Repono Private Limited |
| Land area | 100 m² |
| Forest land | 140 m² |
| Project cost | ₹15 crore |
| Village / locality | Beraja |
| Taluk / tehsil | Mundra |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12441 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Beraja, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Reserve and Protected forest land for the erection of 11 KV HT line — lapsed, 950 m away
- Diversion of Roadside Protected Forest Land of Bhuj Mundra Road for… — forest land use approved, 1.7 km away
- Demanded Roadside Protected Forest Land of Bhuj Mundra Road for Construction… — lapsed, 1.9 km away
- Diversion of 0.034 Ha Road side forest land of Bhuj Mundra Road for… — more information requested, 2.1 km away
- Navin Kanji Kapdi (3.99.00 Ha.) — initial checks, 2.4 km away
- Beraja Black Trap Mining Project Survey No. - 446 Paiki & 697 — initial checks, 2.7 km away
- Mining project by Adani Ports & Special Economic Zone Ltd. — withdrawn, 2.7 km away
- Diversion of 2.2523 Ha Forest land for construction of 33 KV Overhead… — under forest review, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.