Quick answers
What is For approach road of 66kV Rampara Substation?
For approach road of 66kV Rampara Substation is a lapsed power project in Rampara, Wadhwan, Surendranagar, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Getco.
Has it been approved?
No. The application was lapsed on 29 Apr 2026, so it is no longer under consideration.
Where is it?
In Rampara, Wadhwan, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 0 acres and 180 m² of forest land.
When was it filed?
The application was filed on 1 Oct 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: For approach road of 66kV Rampara Substation
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 1 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Getco |
| Land area | 200 m² |
| Forest land | 180 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Rampara |
| Taluk / tehsil | Wadhwan |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12523 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Dec 2024 | Forest land use approved | 0 acres | ₹1.5 crore |
| New project filed 1 Oct 2024 (this page) | Lapsed | 0 acres | ₹1.5 crore |
In context
15 applications in Surendranagar since January 2022 are in the same category (Power): 4 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rampara, Wadhwan, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For approach road of 66kV Rampara Substation — forest land use approved, 0 m away
- For Approach Road For 66kV Rampara S/S — not approved, 50 m away
- Permission for Laying Drinking Water Pipeline in 0.092 Ha. Protected Forest… — forest land use approved, 4.4 km away
- Shri Kishorbhai Ankubhai Khachar — not approved, 4.5 km away
- Shri Narendrasinh K Jhala — under environmental review, 4.6 km away
- Shri Jigneshbhai Lavjibhai Sabhani — not approved, 4.6 km away
- Shree Lalubhi Tapubhai Gadhvi — not approved, 4.8 km away
- Shri Gadhvi Dhanrajbhai Rambhai (blacktrap) — returned to applicant, 5 km away
More from Getco in Surendranagar
- Laying Overhead 66 KV LILO Transmission Line from 66 kV Naladhari to 66 KV… — more information requested
- 66 KV LILO Transmission Line from 66 KV Virpar Substation to 66 KV Bhavanigadh… — more information requested
- For Approach Road For 66kV Rampara S/S — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.