What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Surat, Gujarat

Application seeking Forest Clearance for Widening of road from Magdalla Bridge to Icchapore Circle service road near GIDC Bhatpore and GIDC Icchapore in Hazira Area of Surat

Application seeking Forest Clearance for Widening of road from Magdalla Bridge to Icchapore Circle service road near GIDC Bhatpore and GIDC Icchapore in Hazira Area of Surat is an approved road project in Bhatpor, Chorasi, Surat, Gujarat. The site covers 0.1 acres. Its stated project cost is ₹80 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 10 Aug 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Application seeking Forest Clearance for Widening of road from Magdalla Bridge to Icchapore Circle service road near GIDC Bhatpore and GIDC Icchapore in Hazira Area of Surat is an approved road project in Bhatpor, Chorasi, Surat, Gujarat. The site covers 0.1 acres.

Who is building it?

The applicant is Hazira Notified Area.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 10 Aug 2026), as of 27 Nov 2026.

Where is it?

In Bhatpor, Chorasi, Surat, Gujarat.

How big is it?

It has a stated cost of ₹80 lakh; a site of 0.1 acres and 430 m² of forest land.

When was it filed?

The application was filed on 13 May 2026.

Project details

StatusForest land use approved
Status since10 Aug 2026
Application filed13 May 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantHazira Notified Area
Land area400 m²
Forest land430 m²
Project cost₹80 lakh
Village / localityBhatpor
Taluk / tehsilChorasi
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12594

In context

59 applications in Surat since January 2022 are in the same category (Roads & highways): 13 approved, 30 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.1 acres, this one is smaller than 98% of them.

67 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhatpor, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.