What is Wind Farm Project?
Wind Farm Project is a rejected power project in Sajadiyali, Bhanvad, Devbhumi Dwarka, Gujarat. The site covers 2.2 acres.
Who is building it?
The applicant is Powerica Limited.
Has it been approved?
No. The application was rejected on 22 Aug 2025.
Where is it?
In Sajadiyali, Bhanvad, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹20 lakh; a site of 2.2 acres and 2.2 acres (0.9 ha) of forest land.
When was it filed?
The application was filed on 1 Feb 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 22 Aug 2025 |
| Application filed | 1 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Powerica Limited |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Sajadiyali |
| Taluk / tehsil | Bhanvad |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12607 |
In context
21 applications in Devbhumi Dwarka since January 2022 are in the same category (Power): 4 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. At 2.2 acres, this one is larger than 61% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sajadiyali, Bhanvad, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Forest Division Jamnagar,… — lapsed, 550 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line, Social Forestry Division Dev… — forest land use approved, 2.6 km away
- Shri Shihora Abhay (Gunda Black Trap Block- 1) — lapsed, 7.5 km away
- Shri Shihora Abhay (Gunda Black Trap Block- 2) — lapsed, 7.5 km away
- Shri Maldebhai Devanandbhai Kholani Re-appraisal Area-1.00.00 Survey no.- 375… — environmental approval granted, 7.6 km away
- Diversion of Road side protected forest land of Porbandar Khambhadiya Road for… — forest land use approved, 8.3 km away
- Telecom Network in Ta. Khambhaliya/ kalyanpur and surrounding area — lapsed, 8.8 km away
- Khirasara Black Trap Quarry Lease, (Survey No. 195/P) — environmental approval granted, 8.8 km away
More from Powerica Limited in Devbhumi Dwarka
- Approach Access Road — not approved
- Windfarm Power Project — lapsed
3 Powerica projects in Devbhumi Dwarka
All 4 Powerica projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.