What is Developing? Open the mapMap

In-principle approval, conditions pendingPower · Surat, Gujarat

Ahmedabad – South Olpad (GIS) 765 KV D/C line

Ahmedabad – South Olpad (GIS) 765 KV D/C line is a proposed power project in Andhi, Olpad, Surat, Gujarat. It seeks 70.7 acres of forest land. Its stated project cost is ₹4,784.4 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 16 Nov 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Ahmedabad – South Olpad (GIS) 765 KV D/C line?

Ahmedabad – South Olpad (GIS) 765 KV D/C line is a proposed power project in Andhi, Olpad, Surat, Gujarat. It seeks 70.7 acres of forest land.

Who is building it?

The applicant is South Olpad Transmission Limited.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Andhi, Olpad, Surat, Gujarat.

How big is it?

It has a stated cost of ₹4,784.4 crore and 70.7 acres (28.6 ha) of forest land.

When was it filed?

The application was filed on 14 Apr 2025.

Project details

StatusIn-principle approval, conditions pending
Status since16 Nov 2026
Application filed14 Apr 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantSouth Olpad Transmission Limited
Forest land70.7 acres (28.6 ha)
Project cost₹4,784.4 crore
Village / localityAndhi
Taluk / tehsilOlpad
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12653

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Oct 2026Under coastal review310.2 acres₹4,784.4 crore
New project filed 14 Apr 2025 (this page)In-principle approval, conditions pending₹4,784.4 crore

In context

39 applications in Surat since January 2022 are in the same category (Power): 22 approved, 13 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval.

Where it is

Andhi, Olpad, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from South Olpad Transmission Limited in Surat

3 South Olpad Transmission projects in Surat
All 5 South Olpad Transmission projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.