Quick answers
What is this project?
Diversion of Forest Land for Construction of Bitumen Surface Road Between Zikadi – Kunariya (Km 0/000 to Km 9/250) is a proposed road project in Jikadi, Bhuj, Kachchh, Gujarat. The site covers 17.2 acres.
Who is building it?
The applicant is Office of Excutive Engineer R&b Panchayat Division Bhuj.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Jikadi, Bhuj, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹25 crore; a site of 17.2 acres and 3 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Status | Under forest review |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Office of Excutive Engineer R&b Panchayat Division Bhuj |
| Land area | 17.2 acres (7 ha) |
| Forest land | 3 acres (1.2 ha) |
| Project cost | ₹25 crore |
| Village / locality | Jikadi |
| Taluk / tehsil | Bhuj |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12741 |
In context
76 applications in Kachchh since January 2022 are in the same category (Roads & highways): 23 approved, 32 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.2 acres, this one is larger than 70% of them.
Where it is
Jikadi, Bhuj, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Arrun Gopal Chhanga — environmental approval granted, 5.8 km away
- Dinesh Manji Sorathiya — lapsed, 6.3 km away
- Construction of Approach Road for the Approach Access — forest land use approved, 7 km away
- Shri Bata Pravin Jesha Pvt. Land & Survey No – 341 — initial checks, 7.4 km away
- Shri Bata Pravin Jesha Pvt. Land & Survey No – 341 — cleared for impact study, 7.4 km away
- Bhuj to Sumrasar BSNL OFC Route — forest land use approved, 7.4 km away
- Shri Arun Gopal Chhanga Area-1.04.00 — initial checks, 8.3 km away
- Shri Arun Gopal Chhanga Area-1.04.00 — cleared for impact study, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.