Project details
| Status | Forest land use approved |
|---|---|
| Status since | 11 Oct 2024 |
| Application filed | 9 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Land area | 2,200 m² |
| Forest land | 2,200 m² |
| Project cost | ₹3 crore |
| Village / locality | Nadiad (M) |
| Taluk / tehsil | Nadiad |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12934 |
In context
17 applications in Kheda since January 2022 are in the same category (Pipelines): 12 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.5 acres, this one is larger than 69% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nadiad (M), Nadiad, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vadatal EC Transfer — lapsed, 2 km away
- Development Drilling of 108 Wells, Laying of 4" & 8"oil and Gas Flow Lines and… — environmental approval granted, 5.1 km away
- Mining project by Ganges Geo Resources Private Limited — returned to applicant, 5.1 km away
- Diversion of Protected Forest land for laying of Proposed 90/125mm Dia. Gas… — lapsed, 5.3 km away
- Ec for Exploratory Drilling of 8 Wells for Exploration and Appraisal in 3 Ml… — environmental approval granted, 6.5 km away
- Proposed industrial shed expansion of M/s Torrent Electricals Ltd. for… — under environmental review, 6.8 km away
- Industrial project by M/S. Valens Pharmachem PVT. LTD. — environmental approval granted, 7 km away
- Industrial project by M/S. Valens Pharmachem PVT. LTD. — cleared for impact study, 7 km away
More from Gujarat Gas Limited in Kheda
- Diversion of 0.2063 Ha. of Protected Forest Land I.E. Road Side Strip… — lapsed
- Extension of Pe Pipeline to Connect Along the Nh-48,nadiad to Ahmedabad… — forest land use approved
- Diversion of Protected Forest land for laying of Proposed 90/125mm Dia. Gas… — lapsed
- 125mm Extension of PE Gas Pipeline to Supply Industrial Customers of Fabtech… — forest land use approved
- 125 & 90mm Dia MDPE Gas pipeline for various Connectivity in Kheda, Nadiad &… — more information requested
- 125 Mm Pe Pipeline to Connect New Domestic and Commercial Connections- Nadiad Ga — forest land use approved
12 Gujarat Gas projects in Kheda
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.