What is this project?
Diversion of 3.1437 ha of Forest land for the proposed Conveyor Belt Corridor by Shree Cement Ltd is a lapsed building project in Malda, Lakhpat, Kachchh, Gujarat. The site covers 1,881.6 acres.
Who is building it?
The applicant is Shree Cement Limited.
Has it been approved?
No. The application was lapsed on 11 Apr 2025, so it is no longer under consideration.
Where is it?
In Malda, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹68 crore; a site of 1,881.6 acres and 7.8 acres (3.1 ha) of forest land.
When was it filed?
The application was filed on 2 Mar 2025.
Project details
| Official title | Diversion of 3.1437 ha of Forest land for the proposed Conveyor Belt Corridor at Village: Maldo, Khengarpar, Chher Moti & Mudhvay in Taluka: Lakhpat, District: Kachchh in the State of Gujarat by Shree Cement Ltd. |
|---|---|
| Status | Lapsed |
| Status since | 11 Apr 2025 |
| Application filed | 2 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shree Cement Limited |
| Land area | 1,881.6 acres (761.5 ha) |
| Forest land | 7.8 acres (3.1 ha) |
| Project cost | ₹68 crore |
| Village / locality | Malda |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12936 |
In context
76 applications in Kachchh since January 2022 are in the same category (Buildings & townships): 25 approved, 36 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,881.6 acres, this one is larger than 97% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malda, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Limestone Mine "Mudhvay Sub Block A" (Area: 198.90.98 ha) with… — environmental approval granted, 1.2 km away
- Proposed Limestone Mine "Mudhvay Sub Block A" (Area: 198.90.98 ha) with… — cleared for impact study, 1.2 km away
- Mudhvay Sub-Block 'B' Limestone Mine with Limestone production capacity of… — environmental approval granted, 1.3 km away
- Diversion of 3.5877 ha Forest land for Conveyor Belt Corridor by Shree Cement… — lapsed, 1.5 km away
- Diversion of 2.22 ha Forest land for Proposed Conveyor Belt Corridor by Shree… — lapsed, 1.5 km away
- Diversion of 3.561 ha of Forest land for the proposed Conveyor Belt Corridor… — more information requested, 1.6 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — more information requested, 1.7 km away
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — environmental approval granted, 1.8 km away
More from Shree Cement Limited in Kachchh
- Diversion of 3.561 ha of Forest land for the proposed Conveyor Belt Corridor… — more information requested
- Diversion of 3.5877 ha Forest land for Conveyor Belt Corridor by Shree Cement… — lapsed
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — environmental approval granted
- Jetty and Associated Facilities for Shree Cement Limited in Kori Creek, Gulf… — lapsed
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — cleared for impact study
- Integrated Cement Plant with production capacity of Clinker: 2.65 Million TPA;… — cleared for impact study
11 Shree Cement projects in Kachchh
All 63 Shree Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.