Quick answers
What is this project?
Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project is a proposed building project in Rinzpur, Lalpur, Jamnagar, Gujarat. The site covers 8.9 acres.
Who is building it?
The applicant is Mounting Renewable Powerlimited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Rinzpur, Lalpur, Jamnagar, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh; a site of 8.9 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 25 Oct 2026.
Project details
| Official title | Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project in Survey No. 106 of Village Tebhada, Taluka Lalpur, District Jamnagar, Gujarat. |
|---|---|
| Status | Under forest review |
| Status since | 26 Nov 2026 |
| Application filed | 25 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mounting Renewable Powerlimited |
| Land area | 8.9 acres (3.6 ha) |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Rinzpur |
| Taluk / tehsil | Lalpur |
| District | Jamnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-12938 |
In context
11 applications in Jamnagar since January 2022 are in the same category (Buildings & townships): 6 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. At 8.9 acres, this one is larger than 55% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rinzpur, Lalpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tebhada Forest Crossing — lapsed, 550 m away
- Ghunda Tebhda road 2.1539 ha. — lapsed, 1.4 km away
- Diversion of 0.147 Hectares of Reserve Forest Land for Laying a Water Pipeline… — lapsed, 2.8 km away
- EC under Notification S.O. 1530(E) dated 6th April 2018 of Limestone Mine with… — environmental approval granted, 3 km away
- Shri Jivabhai Bhikhabhai Vadhiya QL- 11359 — lapsed, 4.7 km away
- Shri Jivabhai Bhikhabhai Vadhiya QL- 11357 — initial checks, 5.9 km away
- Shri Jivabhai Bhikhabhai Vadhiya QL-11354 — lapsed, 6.1 km away
- Gop-1 Limestone Mine over Mine lease area of 218.53 ha (Govt. Waste land) for… — environmental approval granted, 7.1 km away
More from Mounting Renewable Powerlimited in Jamnagar
- Tebhada Forest Crossing — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.