Under forest reviewBuildings & townships · Jamnagar, Gujarat

Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project

Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project is a proposed building project in Rinzpur, Lalpur, Jamnagar, Gujarat. The site covers 8.9 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Under forest review” (since 26 Nov 2026).

See it on the live map All projects in Jamnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project is a proposed building project in Rinzpur, Lalpur, Jamnagar, Gujarat. The site covers 8.9 acres.

Who is building it?

The applicant is Mounting Renewable Powerlimited.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Rinzpur, Lalpur, Jamnagar, Gujarat.

How big is it?

It has a stated cost of ₹50 lakh; a site of 8.9 acres and 1.8 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 25 Oct 2026.

Project details

Official titleDiversion of 0.72750 Ha of Reserved Forest Land for Wind Turbine Blade Air Clearance and Laying of an Underground 33 kV Transmission Line for the Proposed 250 MW Wind-Solar Hybrid Power Project in Survey No. 106 of Village Tebhada, Taluka Lalpur, District Jamnagar, Gujarat.
StatusUnder forest review
Status since26 Nov 2026
Application filed25 Oct 2026
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantMounting Renewable Powerlimited
Land area8.9 acres (3.6 ha)
Forest land1.8 acres (0.7 ha)
Project cost₹50 lakh
Village / localityRinzpur
Taluk / tehsilLalpur
DistrictJamnagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-12938

In context

11 applications in Jamnagar since January 2022 are in the same category (Buildings & townships): 6 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. At 8.9 acres, this one is larger than 55% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rinzpur, Lalpur, Jamnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.