Quick answers
What is Diversion of Protected Forest land of 1.0464 Ha?
Diversion of Protected Forest land of 1.0464 Ha is a lapsed telecom project in Dholvani, Bhiloda, Aravalli, Gujarat. The site covers 2.6 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 20 May 2025, so it is no longer under consideration.
Where is it?
In Dholvani, Bhiloda, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹35 lakh; a site of 2.6 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 29 Jun 2024.
Project details
| Official title | Diversion of Protected Forest land of 1.0464 Ha in Arravali District for OFC Cable laying on Bhiloda to Vijaynagar Route. |
|---|---|
| Status | Lapsed |
| Status since | 20 May 2025 |
| Application filed | 29 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 2.6 acres (1.1 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Dholvani |
| Taluk / tehsil | Bhiloda |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13029 |
In context
11 applications in Aravalli since January 2022 are in the same category (Telecom): 5 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.6 acres, this one is larger than 82% of them.
Where it is
Dholvani, Bhiloda, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land for Widening on Bhiloda – Chithoda – Road… — more information requested, 8.8 km away
- 4G Saturation USOF project for Jambudi village Bhiloda Arvalli — forest land use approved, 15.5 km away
- Laying of 12" Dia Steel Gas Pipeline from Idar to Bhiloda Steel Pipeline… — lapsed, 18.2 km away
- Widening and Straightening of Gambhoi - Bamana - Vankaner Road CH: 74/650 Km -… — lapsed, 19.1 km away
- Widening & straightening of Gambhoi-Bamana-Vankaner Road CH: 74/650 Km -… — more information requested, 19.7 km away
- Idar to Bhiloda Steel Pipeline Connectivity — more information requested, 20.2 km away
- Optical Fiber Laying under BHARATNET SPECIAL PROJECT — forest land use approved, 23.8 km away
- Arvalli 4G Saturation USOF project CAT 4 — forest land use approved, 24.5 km away
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.