Quick answers
What is 66kv Radodara Sub Station Approach Road?
66kv Radodara Sub Station Approach Road is an approved road project in Radodara, Bayad, Aravalli, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corporation Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Jul 2025), as of 27 Nov 2026.
Where is it?
In Radodara, Bayad, Aravalli, Gujarat.
How big is it?
It has a stated cost of ₹1 lakh; a site of 0 acres and 70 m² of forest land.
When was it filed?
The application was filed on 19 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 19 Jul 2025 |
| Application filed | 19 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Gujarat Energy Transmission Corporation Limited |
| Land area | 100 m² |
| Forest land | 70 m² |
| Project cost | ₹1 lakh |
| Village / locality | Radodara |
| Taluk / tehsil | Bayad |
| District | Aravalli |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13032 |
In context
14 applications in Aravalli since January 2022 are in the same category (Roads & highways): 2 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Radodara, Bayad, Aravalli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chirayu Sharad Gupta , Gopalpura Blacktrap Quarry Area for an area… — lapsed, 6.3 km away
- Jayesh Kumar D. Patel , BLACKTRAPMINING PROJECT, Survey No. 9, 10 & 16 to… — under environmental review, 6.4 km away
- Patel Shardul , Blacktrap Quarry Area , Survey No. 125/Paiki 5 to Village –… — cleared for impact study, 7.3 km away
- M/s. Kalyan Quarry Works — not approved, 7.3 km away
- M/s. Raghuvir Quarry Works — more information requested, 7.6 km away
- Patel Kulinkumar Vallabhdas , BLACKTRAP MINING PROJECT, Survey No. 113 to… — under environmental review, 7.7 km away
- Patel Kulinkumar Vallabhdas , Blacktrap Quarry Area for an area 02.07.30 Hect — returned to applicant, 7.7 km away
- Patel Kulinkumar Vallabhdas , BLACKTRAP MINING PROJECT, Survey No. 113 to… — cleared for impact study, 7.7 km away
All 38 Gujarat Energy Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.