Quick answers
What is Surat 4G Sat USOF VVIP?
Surat 4G Sat USOF VVIP is an approved telecom project in Ambadi, Umarpada, Surat, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Apr 2026), as of 27 Nov 2026.
Where is it?
In Ambadi, Umarpada, Surat, Gujarat.
How big is it?
It has a stated cost of ₹9.3 crore; a site of 0.3 acres and 1,400 m² of forest land.
When was it filed?
The application was filed on 15 Jun 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Apr 2026 |
| Application filed | 15 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1,400 m² |
| Forest land | 1,400 m² |
| Project cost | ₹9.3 crore |
| Village / locality | Ambadi |
| Taluk / tehsil | Umarpada |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13159 |
In context
20 applications in Surat since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 15 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 56% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambadi, Umarpada, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mandvi Surat 4G Sat USO — lapsed, 700 m away
- Mandvi Surat 4G Sat USOF — under forest review, 700 m away
- Surat 4G Sat VVIP 2 — forest land use approved, 2.2 km away
- 4 laning from Dahod-Vapi Section of NH-56 in Gujarat PKG VI Nasarpore to… — lapsed, 4.1 km away
- 4 laning from Dahod-Vapi Section of NH-56 in Gujarat PKG VI Nasarpore to… — lapsed, 4.1 km away
- 4 laning from Dahod-Vapi Section of NH-56 in Gujarat PKG VI Nasarpore to… — lapsed, 4.1 km away
- 4G Saturation USOF Project VVIP Case Kevdi village — lapsed, 4.5 km away
- Diversion of 2.0032 Ha Forest Land for Construction of Earthen to Blacktop… — lapsed, 4.5 km away
More from Mahesh Nair in Surat
- BSNL OFC Laying Under Police Department Project VISHWAS (CCTV) Funded by Govt.… — lapsed
- BSNL OFC Laying Under Police Department Project VISHWAS (CCTV) Funded by Govt.… — lapsed
- 4G Saturation USOF Project VVIP Case Kevdi village — lapsed
- Laying OFC for 4G coverage of uncovered villages through USOF, Kakdapar GP to… — lapsed
- Surat 4G Sat VVIP 2 — forest land use approved
- Laying Ofc for 4g Coverage of Uncovered Villages Through Usof, Village… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.