Quick answers
What is this project?
2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan Project is an approved project in Dudhiyavidi, Kutiyana, Porbandar, Gujarat. The site covers 374.7 acres.
Who is building it?
The applicant is Oil and Natural Gas Corporation (ONGC).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 29 Apr 2026), as of 27 Nov 2026.
Where is it?
In Dudhiyavidi, Kutiyana, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹17 lakh; a site of 374.7 acres and 368.5 acres (149.1 ha) of forest land.
When was it filed?
The application was filed on 19 Apr 2026.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 29 Apr 2026 |
| Application filed | 19 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Oil and Natural Gas Corporation (ONGC) |
| Land area | 374.7 acres (151.6 ha) |
| Forest land | 368.5 acres (149.1 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Dudhiyavidi |
| Taluk / tehsil | Kutiyana |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13210 |
All filings for this project
This project has 6 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Apr 2026 (this page) | Forest land use approved | 374.7 acres | ₹17 lakh |
| New project filed 15 Apr 2026 | Lapsed | 374.7 acres | ₹17 lakh |
| New project filed 24 Mar 2026 | Lapsed | 374.7 acres | ₹17 lakh |
| New project filed 17 Dec 2025 | Lapsed | 374.7 acres | ₹17 lakh |
| New project filed 31 Oct 2025 | Lapsed | 374.7 acres | ₹17 lakh |
| New project filed 13 May 2025 | Lapsed | 374.7 acres | ₹17 lakh |
In context
20 applications in Porbandar since January 2022 are in the same category (Other): 8 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 374.7 acres, this one is larger than 63% of them.
Where it is
Dudhiyavidi, Kutiyana, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan… — lapsed, 0 m away
- 2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan… — lapsed, 0 m away
- 2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan… — lapsed, 0 m away
- 2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan… — lapsed, 0 m away
- 2D Seismic Data Acquisition in Sector-05 (Saurashtra) under Mission Anveshan… — lapsed, 0 m away
- Diversion of Normal Forest Land for laying 40mm dia. HDEP Pipe along Udepur… — lapsed, 6.8 km away
- Proposed Mining of Sindhpur Limestone on Survey No. 147 Paiki near, Village –… — initial checks, 9 km away
- Proposed Mining of Sindhpur Limestone on Survey No. 147 Paiki near, Village –… — cleared for impact study, 9 km away
6 Oil and Natural Gas Corporation (ONGC) projects in Porbandar
All 243 Oil and Natural Gas Corporation (ONGC) projects across India