Project details
| Status | More information requested |
|---|---|
| Status since | 2 Jan 2026 |
| Application filed | 5 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Continuum Trinethra Renewables Private Limited |
| Land area | 2,300 m² |
| Forest land | 2,310 m² |
| Project cost | ₹50 lakh |
| Village / locality | Pipaliyaraj |
| Taluk / tehsil | Wankaner |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13212 |
In context
32 applications in Morbi since January 2022 are in the same category (Roads & highways): 10 approved, 14 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.6 acres, this one is smaller than 83% of them.
Where it is
Pipaliyaraj, Wankaner, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 33 KV Overhead Transmission Line By Azalea Enterprises Pvt. Ltd — lapsed, 6.1 km away
- Shri Darshit V Karia — environmental approval granted, 6.7 km away
- Shri Dineshkumar Jerajbhai Mankadiya — environmental approval granted, 6.8 km away
- 11 KV UG Cable Line Across/Parallel Mitana-Paddhari Road in Morbi Dist. — lapsed, 7.8 km away
- Shri Gadara Shantilal Pragjí. — environmental approval granted, 8.8 km away
- Gadara Shantilal Pragji Block - C — environmental approval granted, 8.9 km away
- Proposed Synthetic Organic Chemical Project (Resin-4500mt/Month) Manufacturing… — environmental approval granted, 9.2 km away
- Industrial project by M/s. Capital Steel Corporation — cleared for impact study, 9.2 km away