Project details
| Official title | Layiing of 8" dia. Steel Underground Gas Pipeline from Khali to Kheralu upto Star Petroleum, Vadnagar & Gaytri Petroleum Connectivity in Mehsana District. |
|---|---|
| Status | Lapsed |
| Status since | 23 Jul 2026 |
| Application filed | 12 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sabarmati Gas LTD |
| Land area | 3.4 acres (1.4 ha) |
| Forest land | 3.4 acres (1.4 ha) |
| Project cost | ₹5 crore |
| Village / locality | Balad |
| Taluk / tehsil | Kheralu |
| District | Mahesana |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13231 |
In context
33 applications in Mahesana since January 2022 are in the same category (Pipelines): 11 approved, 8 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 3.4 acres, this one is larger than 94% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Balad, Kheralu, Mahesana, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Khali-Kheralu Steel pipeline Connectivity in Mehsana District — more information requested, 4.8 km away
- Kheralu-Vadnagar Connectivity — more information requested, 7.2 km away
- Laying of 4" Dia. Steel Gas Pipeline For Jalaram Petroleum(New RO)… — lapsed, 8.3 km away
- Mahesana to Nani Hirvani — more information requested, 9 km away
- Diversion of Forest Land (Area 0.0914 Ha.) to lay 11 kV Underground Power… — more information requested, 11.9 km away
- Laying of 4" Dia Steel Gas Pipeline For Bharat CNG Station Pipeline Connectivity — more information requested, 12.8 km away
- Proposed underground 125/90/63 mm Dia MDPE Gas Pipeline Connectivity in Taluka… — lapsed, 16 km away
- Laying of Under Ground Cable in Forest Area at Vadnagar Visnagar Road — lapsed, 16 km away
More from Sabarmati Gas LTD in Mahesana
- Laying of 4" Dia. Steel Gas Pipeline For Jalaram Petroleum(New RO)… — lapsed
- Vijapur to Ishwarkrupa CNG Station Ladol to RamKabir KSK CNG Station Falu to J… — more information requested
- Laying of 4" Dia Steel Gas Pipeline For Bharat CNG Station Pipeline Connectivity — more information requested
- Pashupatinath CNG Connectivity — forest land use approved
- Vijapur Reinforcement Steel Pipeline Connectivity, Vijapur — forest land use approved
- Kheralu-Vadnagar Connectivity — more information requested
28 Sabarmati Gas projects in Mahesana
All 76 Sabarmati Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.