Quick answers
What is this project?
Diversion of 0.1388 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable is a lapsed power project in Devsar, Gandevi, Navsari, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Nilamkumar N Patel.
Has it been approved?
No. The application was lapsed on 21 Feb 2026, so it is no longer under consideration.
Where is it?
In Devsar, Gandevi, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹62 lakh; a site of 0.3 acres and 1,390 m² of forest land.
When was it filed?
The application was filed on 22 Jan 2026.
Project details
| Official title | Diversion of 0.1388 Hectare of Protected Forest Land I.E. Road Side Strip Plantation Declared As Protected Forest for Laying Under Ground (11KV 185 Sq Mm Xlpe With 110mm Pvc Casing) 11KV 185 Sq.Mm Xlpe Cable Under Rdss Scheme of Dgvcl to Various En-Route Villages in Taluka Gandevi of District Navsari. |
|---|---|
| Status | Lapsed |
| Status since | 21 Feb 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Nilamkumar N Patel |
| Land area | 1,400 m² |
| Forest land | 1,390 m² |
| Project cost | ₹62 lakh |
| Village / locality | Devsar |
| Taluk / tehsil | Gandevi |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13306 |
In context
11 applications in Navsari since January 2022 are in the same category (Power): 5 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.3 acres, this one is smaller than 100% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devsar, Gandevi, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 66KV Dhanori Line — lapsed, 1.1 km away
- 90 mm Dia PE Gas Pipeline Connectivity for Dhanori to Manekpore & Avsar Villa… — forest land use approved, 1.1 km away
- 90 mm Dia PE Gas Pipeline Connectivity for Dhanori to Manekpore & Avsar Villa… — lapsed, 1.1 km away
- Diversion of 0.0042 ha Protected forest land for Approach road for Entry and… — forest land use approved, 1.3 km away
- Proposed 50 KLPD Molasses /Sugarcane Juice/Sugar Syrup/Sugar based Distillery… — more information requested, 1.9 km away
- Diversion of 3.1076 Hectare of Canal and Road Side Strip Plantation Declared… — more information requested, 2 km away
- Navalsang Laxmanbhai Parmar — under environmental review, 2.1 km away
- Dangar Dhaval Alabhai — under environmental review, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.