Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 23 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Forest land | 20 m² |
| Project cost | ₹3 lakh |
| Village / locality | Nichi Mandal |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13310 |
In context
19 applications in Morbi since January 2022 are in the same category (Pipelines): 16 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nichi Mandal, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Addition of Formaldehyde Based Resin Plant (Phenol, Melamine, Urea & Cardanol-… — under environmental review, 1.6 km away
- Expansion for Proposed Project Synthetic Organic Chemicals (Resin-1000… — environmental approval granted, 1.7 km away
- Shri Hasmukhbhai Ambarambhai Patel. Reapprasial ARea-3.22.68Govt land & Survey… — environmental approval granted, 3.5 km away
- Shri Kantilal Mohanbhai Desai — environmental approval granted, 3.6 km away
- Shri Kantilal Mohanbhai Desai — environmental approval granted, 3.6 km away
- 66 KV S/C line from Exist. Nichi Mandal SS to Prop. M/s. Luxgres Ceramica LLP… — lapsed, 3.6 km away
- Laying UG 11 KV Transmission line parallel to Morbi-Halvad Road — forest land use approved, 3.7 km away
- Shri Vinodbhai Jethabhai Loria Reapprasial ARea-1.70.42Govt land & Survey no.-… — environmental approval granted, 4.3 km away
More from Gujarat Gas Limited in Morbi
- Diversion of 0.0024 Ha. of PF Land for laying of 6" Dia NB Steel Gas Pipeline… — forest land use approved
- Diversion of 0.044 Hectare of Protected Forest Land for laying 125 MM dia. PE… — forest land use approved
- 6" Dia NB Steel Gas Pipeline Connectivity From FDODO CNG Point Vajepar, Taluka… — forest land use approved
- 125 Mm Dia PE Pipeline for Extenson Of PE Pipeline For New Industrial… — forest land use approved
- 125/90 mm Dia PE Gas Pipeline for extension of PE Pipeline for New Domestic… — forest land use approved
- 125mm Dia PE Gas Pipeline CPRS near Gokul Snacks for proposed ind. Customers… — forest land use approved
18 Gujarat Gas projects in Morbi
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.