Quick answers
What is this project?
Diversion of 0.0005 Ha. Of Protected Forest land for laying of Proposed 125mmØ GGL Gas Pipeline Across Asphalt Road (To Vaktana) from Tap-off Point (on Ex.125mmØ GGL Gas Pipeline) to WEE Pac is an approved pipeline project in Bhatia, Chorasi, Surat, Gujarat. It seeks 0 acres of forest land.
Who is building it?
The applicant is Gujarat Gas Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Apr 2024), as of 27 Nov 2026.
Where is it?
In Bhatia, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹2 lakh and 10 m² of forest land.
When was it filed?
The application was filed on 3 Sept 2023.
Project details
| Official title | Proposal for Diversion of 0.0005 Ha. Of Protected Forest land for laying of Proposed 125mmØ GGL Gas Pipeline Across Asphalt Road (To Vaktana) from Tap-off Point (on Ex.125mmØ GGL Gas Pipeline) to WEE Pac in Chorasi taluka of Surat District of Surat of Surat GA. |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Apr 2024 |
| Application filed | 3 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Gujarat Gas Limited |
| Forest land | 10 m² |
| Project cost | ₹2 lakh |
| Village / locality | Bhatia |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13335 |
In context
36 applications in Surat since January 2022 are in the same category (Pipelines): 16 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhatia, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Amendment in Existing Environmental Clearance for Common Effluent… — environmental approval granted, 3.2 km away
- M/S. Gokulanand Petrofibers Proposed Product Mix With Respect to No Increase… — initial checks, 3.4 km away
- Diversion of 0.2692 Ha of Protected Forest Land for Construction of 5.5 m Wide… — lapsed, 3.5 km away
- Diversion of Protected Forest Land for laying of proposed 66kv D/C UG Cable… — forest land use approved, 3.5 km away
- BSNL OFC Laying Under Police Department Project VISHWAS (CCTV) Funded by Govt.… — lapsed, 3.7 km away
- BSNL OFC Laying Under Police Department Project VISHWAS (CCTV) Funded by Govt.… — lapsed, 3.7 km away
- Entry/Access Road for M/s RajhansTexon, Village Vanz, Taluka Choryasi,… — forest land use approved, 3.7 km away
- Diversion of 0.2187 ha Protected Forest Land for Construction of Service Road… — more information requested, 3.7 km away
More from Gujarat Gas Limited in Surat
- Diversion of 0.0337 Ha. of Protected Forest Land I.E. Road Side Strip… — in-principle approval, conditions pending
- Diversion of 0.0123 Ha. of PF Land for laying of 125 mm PE Pipeline Network to… — more information requested
- Diversion of 0.0020 ha. of PF land for laying of 6" Dia. NB Steel Gas Pipeline… — more information requested
- Gas Distribution Network in Mangrol Taluka & Surrounding Area (Mangrol Taluka… — lapsed
- : Diversion of 0. 0.9016 Ha. of Protected Forest Land for Laying 125 Mm Dia.… — lapsed
- Gas Distribution Network in Mandavi Taluka& Surrounding Area (D C Shah petrol… — more information requested
20 Gujarat Gas projects in Surat
All 289 Gujarat Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.