| Status | Forest land use approved |
|---|---|
| Status since | 26 Oct 2023 |
| Application filed | 24 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 2,600 m² |
| Forest land | 2,600 m² |
| Project cost | ₹17.3 crore |
| Village / locality | Demti |
| Taluk / tehsil | Poshina |
| District | Sabar Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13348 |
In context
12 applications in Sabar Kantha since January 2022 are in the same category (Telecom): 2 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.6 acres, this one is larger than 70% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Demti, Poshina, Sabar Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dharoi based Poshina RWSS Part-3 — initial checks, 4.4 km away
- Navamota Limestone Mine (Survey No-38 B), Area-0.80.56Ha. of Shri N J Khan (… — not approved, 5 km away
- Navamota Limestone Mine Survey No-38 A Area-1.94.25Ha. of Shri N J Khan… — not approved, 5 km away
- Head Works With Ugsr -Esr Raw Water Pumping Mains and Gravity Mains — under forest review, 6 km away
- Proposal of Forest Land for Bharti Airtel Limited (Airtel) Underground Optical… — lapsed, 8.6 km away
- constructing of Khandhora-Ganchhali-chhochhar Road — under forest review, 9.5 km away
- Sabarkantha 4G Sat USO — lapsed, 9.7 km away
- Yusufbhai Nashirkhan Pathan. — initial checks, 11.1 km away
More from Mahesh Nair in Sabar Kantha
- 4G saturation USOF SABARKANTHA CAT5/6 ZOD — under forest review
- Sabarkantha 4G Saturation CAT-6 DBN Project. — under forest review
- 4g Saturation Usof Sabar Kantha Cat-5/6 — under forest review
- 4g Saturation Project Site Mamapipla and Dedka Ofc Layoing Permission of… — more information requested
- 4g Saturation Project Site Mamapipla and Dedka Ofc Layoing Permission of… — lapsed
- Sabarkantha 4G Saturation USOF project CAT-4 — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.