Quick answers
What is this project?
Diversion of 0.5100 Ha protected forest land for the project of Widening of Arak - Sisodara SH Road (From NH - 48 to Bhagyashree Infraspace llp) for Construction of Warehouse by BHAGYASHREE INFRASPACE LLP is a lapsed road project in Alak, Jalalpore, Navsari, Gujarat. The site covers 1.3 acres.
Who is building it?
The applicant is Rakesh Radheshyam Jangid.
Has it been approved?
No. The application was lapsed on 7 Jan 2026, so it is no longer under consideration.
Where is it?
In Alak, Jalalpore, Navsari, Gujarat.
How big is it?
It has a stated cost of ₹4 crore; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 8 Dec 2025.
Project details
| Official title | Proposal for Diversion of 0.5100 Ha protected forest land for the project of Widening of Arak - Sisodara SH Road (From NH - 48 to Bhagyashree Infraspace llp) for Construction of Warehouse by BHAGYASHREE INFRASPACE LLP in Jalalpore Tauka of Navsari District in the State of Gujarat. |
|---|---|
| Status | Lapsed |
| Status since | 7 Jan 2026 |
| Application filed | 8 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rakesh Radheshyam Jangid |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹4 crore |
| Village / locality | Alak |
| Taluk / tehsil | Jalalpore |
| District | Navsari |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13451 |
In context
38 applications in Navsari since January 2022 are in the same category (Roads & highways): 20 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is larger than 56% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alak, Jalalpore, Navsari, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0553 ha Protected forest land for Approach road for Entry and… — forest land use approved, 450 m away
- Grant of Permission to Lay Optical Fiber Cable From Vesma Village to Sisodra… — lapsed, 550 m away
- Grant of Permission to lay optical fiber cable along the road From Vesma… — lapsed, 1.6 km away
- Vinchem Industries — under environmental review, 1.8 km away
- Truecare Infra And Healthcare — under environmental review, 3 km away
- 6" dia Steel Gas pipeline for connectivity of Harekrishna Petroleum, BPCL… — forest land use approved, 3.7 km away
- Prashant S Naik (A Lease Holder) — not approved, 6.8 km away
- Prashant S Naik — not approved, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.