Diversion of 0.0802 Ha. Reserved Forest for the Permission for laying proposed Solar Power Cable line size 3 core 185 mm 11 K.V. cable village Matirala Reserved Forest Survey No. 712 Pt. on out from Survey No. 277 Pt.,278,289 Pt.1 290 Pt.2 292/1 282 & 291 Matirala village to 66 KV GETCO Substation Malaviya Pipariya village Solar Project (0.0802 Ha.) Ta.Lathi Dist.Amreli in Gujarat State.

Diversion of 0.0802 Ha. Reserved Forest for the Permission for laying proposed Solar Power Cable line size 3 core 185 mm 11 K.V. cable village Matirala Reserved Forest Survey No. 712 Pt. on out from Survey No. 277 Pt.,278,289 Pt.1 290 Pt.2 292/1 282 & 291 Matirala village to 66 KV GETCO Substation Malaviya Pipariya village Solar Project (0.0802 Ha.) Ta.Lathi Dist.Amreli in Gujarat State is a proposed power project in Aliudepur, Lathi, Amreli, Gujarat. The site covers 0.2 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “More information requested” (since 11 Sept 2026).

See it on the live map All projects in Amreli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.0802 Ha. Reserved Forest for the Permission for laying proposed Solar…

Project details

StatusMore information requested
Status since11 Sept 2026
Application filed23 May 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantGUJARAT HY-SPIN Limited
Land area800 m²
Forest land800 m²
Project cost₹50 lakh
Village / localityAliudepur
Taluk / tehsilLathi
DistrictAmreli
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13595

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 May 2026 (this page)More information requested0.2 acres₹50 lakh
New project filed 4 Apr 2026In-principle approval, conditions pending0.2 acres₹50 lakh

In context

18 applications in Amreli since January 2022 are in the same category (Power): 9 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.2 acres, this one is larger than 53% of them.

Where it is

Aliudepur, Lathi, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.