Project details
| Official title | PROPOSAL FOR LAYING OF UNDEERGROUND GAS PIPILINE AT PPC BAKERY CONNECTIVITY 0.168 Ha. |
|---|---|
| Status | More information requested |
| Status since | 25 Sept 2024 |
| Application filed | 14 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hirenkumar Khokhar |
| Land area | 1,700 m² |
| Forest land | 1,680 m² |
| Project cost | ₹50 lakh |
| Village / locality | Kamalpur |
| Taluk / tehsil | Prantij |
| District | Sabar Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13643 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jun 2024 (this page) | More information requested | 0.4 acres | ₹50 lakh |
| New project filed 10 Mar 2024 | Lapsed | 44.7 acres | ₹50 lakh |
In context
36 applications in Sabar Kantha since January 2022 are in the same category (Pipelines): 8 approved, 14 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.4 acres, this one is smaller than 70% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kamalpur, Prantij, Sabar Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- LAYING OF UNDEERGROUND GAS PIPILINE AT PPC BAKERY CONNECTIVITY 0.168 Ha — lapsed, 50 m away
- Laying of proposed SGL Existing Pipeline at Gopinath Complex, Prantij to Vinod… — forest land use approved, 1.5 km away
- Shri Sachin Kaushikkumar Suthar — lapsed, 4.7 km away
- Shri Sachin Kaushikkumar Suthar Pvt. Land& Survey No.-523, Adj. to Sabarmati… — lapsed, 4.7 km away
- Request to Grant Permission for 125/90mm Dia Mdpe Gas Pipeline Laying to… — more information requested, 4.9 km away
- Galteshwar Ordinary sand/Gravel Mine of Badarji Makaji Vanzara — environmental approval granted, 4.9 km away
- PROPOSED RESIN MANUFACTURING PLANT WITHIN THE EXISTING LAMINATE MANUFACTURING… — environmental approval granted, 5 km away
- PROPOSED RESIN MANUFACTURING PLANT WITHIN THE EXISTING LAMINATE MANUFACTURING… — cleared for impact study, 5 km away
More from Hirenkumar Khokhar in Sabar Kantha
- Request to grant Permission for 125/90mm dia MDPE Gas Pipeline laying to… — more information requested
- Laying of 125/90 mm dia underground MDPE gas pipeline along the… — more information requested
- Request to Grant Permission for 125/90mm Dia Mdpe Gas Pipeline Laying to… — more information requested
- Laying of 125/90 mm Dia MDPE Gas Pipeline along and across on NH 48 from… — forest land use approved
- Permission for 125/90mm Dia Mdpe Gas Pipeline Laying to Supply Natural Gas to… — lapsed
- Proposed 125/90 Mm Dia Underground Mdpe Gas Pipeline Along the NH 48 Near… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.