Project details
| Official title | Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline of Kadana Dam Bulk Pipeline Based Garadu Regional Water Supply Scheme, Village:- Dhadhela, Vaghvadla, Patisra, Bhitodi, Itna, Moti Bara, Lakhanpur, Taluka:-Fatepura & Garadu,Bambela,Kheda Taluka:-Zalod in District:-Dahod in Gujarat State. (0.6539 Ha). |
|---|---|
| Status | Forest land use approved |
| Status since | 15 Jul 2026 |
| Application filed | 28 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer,gwssb,dahod |
| Land area | 1.8 acres (0.7 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Project cost | ₹62.1 crore |
| Village / locality | Inta |
| Taluk / tehsil | Fatepura |
| District | Dohad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13660 |
In context
13 applications in Dohad since January 2022 are in the same category (Water & irrigation): 8 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2.4 years from filing to approval. At 1.8 acres, this one is smaller than 77% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Inta, Fatepura, Dohad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal of Reserved Forest for Construction U/G Water Pipeline, Sump of… — forest land use approved, 1.6 km away
- Proposal of Reserved Forest Land for Construction U/G Sump, Water Pipeline… — forest land use approved, 5.1 km away
- Proposal of Reserved Forest Land for Construction U/G Water Pipeline, Sump of… — forest land use approved, 6.3 km away
- Proposal of Reserved Forest Land for Bharti Airtel Limited (Airtel)… — lapsed, 6.4 km away
- Widening and Strengthening of Santrampur - Zalod - Kushalgadh Road. Ch.… — more information requested, 7.3 km away
- Diversion of 0.4680 Ha. Reserved Forest land to be used for work of 66 KV S/C… — lapsed, 9 km away
- Request for Diversion of 0.0080 Ha Protected Forest Land for Installation of… — more information requested, 14.9 km away
- Proposal of Reserved Forest Land for Construction of Newly Village Pond,… — lapsed, 17.2 km away
More from Executive Engineer,gwssb,dahod in Dohad
- Proposal of Reserved Forest Land for Construction U/G Sump, Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction U/G Water Pipeline, Sump,… — more information requested
- Proposal of Reserved Forest for Construction U/G Water Pipeline, Sump of… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — forest land use approved
- Proposal of Reserved Forest Land for Construction of Sump & U/G Water Pipeline… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.