Quick answers
What is Upgradation of SH-96 from Mendarda to Visavadar?
Upgradation of SH-96 from Mendarda to Visavadar is a lapsed road project in Jamka, Junagadh, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Executive Engineer Road and Building Department Junagadh.
Has it been approved?
No. The application was lapsed on 31 Jul 2026, so it is no longer under consideration.
Where is it?
In Jamka, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹50 crore; a site of 0.2 acres and 950 m² of forest land.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Jul 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Road and Building Department Junagadh |
| Land area | 1,000 m² |
| Forest land | 950 m² |
| Project cost | ₹50 crore |
| Village / locality | Jamka |
| Taluk / tehsil | Junagadh |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13691 |
In context
28 applications in Junagadh since January 2022 are in the same category (Roads & highways): 2 approved, 18 filed or under review, and 8 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 84% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamka, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jagubhai Raningbhai Hudad (Jambala Blacktrap Mine 0.64) — not approved, 1.6 km away
- Hudad Jagubhai Raningbhai — lapsed, 1.6 km away
- Black Trap Mine of jagubhai Raningbhai hudad — more information requested, 2.7 km away
- Construction of Gundala to Zinzuda Road — lapsed, 5.1 km away
- Kenedipur Headwork — forest land use approved, 7.1 km away
- Laying UG Drinking water pipeline from Kenedipur HW pipeline — forest land use approved, 7.2 km away
- Approach Road Access in Vil:kenedipur Tal:mendarda Dist:junagadh — lapsed, 7.6 km away
- Diversion of 0.1986 Ha. of Protected Forest Land for Laying Underground… — forest land use approved, 10 km away
More from Executive Engineer Road and Building Department Junagadh in Junagadh
- Two Lane Elevated Corridor at Visavadar-Sasan Road in Dist:junagadh — more information requested
- Two Lane Elevated Corridor at Visavadar-Sasan Road in Dist:junagadh — more information requested
- Diversion of 15.48 Ha. Protected Forest Land for Widening of existing… — more information requested
- Permission for Widening of Galodan Sasan Road (SH-100A) from Vill. Jalondhar… — under wildlife review
- Diversion of Reserve Forest and Protected Forest land for widening of Galodan… — lapsed
- Permission for Widening of Galodan Sasan Road (SH-100A) from Vill. Jalondhar… — more information requested
7 Executive Engineer Road and Building Department Junagadh, Gujarat projects in Junagadh
All 8 Executive Engineer Road and Building Department Junagadh, Gujarat projects across India