What is Developing? Open the mapMap

Under forest reviewPipelines · Kachchh, Gujarat

Engineering Procurement Construction (EPC) work for pipe Line Project from Tappar village (MPS-3) to Sanadhro Reservoir Southern Link Phase-II, Including Operation and Maintenance of the Commissioned project for 10 years.

Engineering Procurement Construction (EPC) work for pipe Line Project from Tappar village (MPS-3) to Sanadhro Reservoir Southern Link Phase-II, Including Operation and Maintenance of the Commissioned project for 10 years is a proposed pipeline project in Murchbana, Lakhpat, Kachchh, Gujarat. The site covers 51.2 acres. Its stated project cost is ₹1,405.5 crore. As of 27 Nov 2026, its status is “Under forest review” (since 26 Nov 2026).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Engineering Procurement Construction (EPC) work for pipe Line Project from Tappar village (MPS-3) to Sanadhro Reservoir Southern Link Phase-II, Including Operation and Maintenance of the Commissioned project for 10 years is a proposed pipeline project in Murchbana, Lakhpat, Kachchh, Gujarat. The site covers 51.2 acres.

Who is building it?

The applicant is Executive Engineer, Kachchh Irrigation Construction Division, Bhuj.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Murchbana, Lakhpat, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹1,405.5 crore; a site of 51.2 acres and 51.3 acres (20.7 ha) of forest land.

When was it filed?

The application was filed on 7 Apr 2025.

Project details

StatusUnder forest review
Status since26 Nov 2026
Application filed7 Apr 2025
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantExecutive Engineer, Kachchh Irrigation Construction Division, Bhuj
Land area51.2 acres (20.7 ha)
Forest land51.3 acres (20.7 ha)
Project cost₹1,405.5 crore
Village / localityMurchbana
Taluk / tehsilLakhpat
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13692

In context

59 applications in Kachchh since January 2022 are in the same category (Pipelines): 21 approved, 25 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 51.2 acres, this one is larger than 84% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Murchbana, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer, Kachchh Irrigation Construction Division, Bhuj in Kachchh

All 4 Executive Engineer, Kachchh, Gujarat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.