Quick answers
What is this project?
Widening & Strengthening 5.50 meter to 12.00 meter of Subir to Singhana Road ( SH-80, Chainage 37/419 to Chainage 37/962) is an approved road project in Golan, Songadh, Tapi, Gujarat. The site covers 0.1 acres.
Who is building it?
The applicant is State Roads and Buildings Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 13 Apr 2026), as of 27 Nov 2026.
Where is it?
In Golan, Songadh, Tapi, Gujarat.
How big is it?
It has a stated cost of ₹5 lakh; a site of 0.1 acres and 610 m² of forest land.
When was it filed?
The application was filed on 15 Feb 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 13 Apr 2026 |
| Application filed | 15 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | State Roads and Buildings Department |
| Land area | 600 m² |
| Forest land | 610 m² |
| Project cost | ₹5 lakh |
| Village / locality | Golan |
| Taluk / tehsil | Songadh |
| District | Tapi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13704 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Mar 2023 | Application filed | 0.1 acres | ₹5 lakh |
| New project filed 15 Feb 2023 (this page) | Forest land use approved | 0.1 acres | ₹5 lakh |
In context
16 applications in Tapi since January 2022 are in the same category (Roads & highways): 4 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 80% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Golan, Songadh, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Widening & Strengthening 5.50 meter to 12.00 meter of Subir to Singhana Road (… — application filed, 0 m away
- New Bridge at Golan (Gira river) on SH-80, Ahwa- Navapura road KM.39/200 to… — forest land use approved, 1.8 km away
- Diversion of 2.3657 Hectare of Reserve Forest Land Declared As Reserve Forest… — lapsed, 10.4 km away
- Diversion of 4.4070 Hectare of Reserve Forest Land I.E. Road Side Strip… — more information requested, 11.1 km away
- Diversion of 15.5685 ha. PF (8.4681 ha.) & RF (7.1004 ha.) Land for widening… — more information requested, 12.6 km away
- of Widening and Strengthening of Tokarava-Chimkuva-Medha-Chimer-Khapatiya Road… — lapsed, 12.7 km away
- Diversion of 2.2100 Hectare of Reserve Forest Land I.E. Village Forest… — lapsed, 13.3 km away
- Diversion of 2.2498 Hectare of Protected Forest Land I.E. Road Side Strip… — forest land use approved, 13.8 km away
More from State Roads and Buildings Department in Tapi
- New Bridge at Golan (Gira river) on SH-80, Ahwa- Navapura road KM.39/200 to… — forest land use approved
3 State Roads and Buildings Department projects in Tapi
All 16 State Roads and Buildings Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.