What is Developing? Open the mapMap

Forest land use approvedPower · Vadodara, Gujarat

Diversion of Forest land 0.0370 Ha to set up Solar Plant

Diversion of Forest land 0.0370 Ha to set up Solar Plant is an approved power project in Simli, Sinor, Vadodara, Gujarat. The site covers 0.1 acres. Its stated project cost is ₹2 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 25 May 2026).

See it on the live map All projects in Vadodara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since25 May 2026
Application filed9 Jan 2026
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantSun Drops Energia Private Limited
Land area400 m²
Forest land370 m²
Project cost₹2 lakh
Village / localitySimli
Taluk / tehsilSinor
DistrictVadodara
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-13763

In context

19 applications in Vadodara since January 2022 are in the same category (Power): 5 approved, 6 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.

Where it is

Simli, Sinor, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.