Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Jul 2025 |
| Application filed | 13 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Adani Total Gas Limited |
| Land area | 900 m² |
| Forest land | 900 m² |
| Project cost | ₹2 crore |
| Village / locality | Bhaner |
| Taluk / tehsil | Kathlal |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13830 |
In context
17 applications in Kheda since January 2022 are in the same category (Pipelines): 12 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.2 acres, this one is smaller than 56% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhaner, Kathlal, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Narendrasinh G. Barad Re-appraisal Area-1.25.00 Survey no.- 117 Ne Lagu… — environmental approval granted, 2.9 km away
- Kheda dist. OFC Project — more information requested, 9.1 km away
- Ahmedabad to Dakor High Speed Corridor Road Project — in-principle approval, conditions pending, 9.8 km away
- Laying of 6" Ø MS Gas Pipeline across SH-59 (Nadiad-Modasa Road) and along Old… — forest land use approved, 9.9 km away
- Shri Chandubhai Kanabhai Vanzara Reapprasial ARea-1.00.00Govt. Land & Survey… — environmental approval granted, 11.9 km away
- Udabhai Sukhabhai Zala ( Haldarvas Ordinary Sand Block - F) — cleared for impact study, 12.7 km away
- Shri Arvindbhai Rohitkumar Parmar — returned to applicant, 12.8 km away
- Arvindbhai Rohitkumar Parmar (Haldarvas Ordinary Sand Block No- E) — under environmental review, 12.8 km away
More from Adani Total Gas Limited in Kheda
- Dakor Connectivity — forest land use approved
- Laying of 6" Ø MS Gas Pipeline across SH-59 (Nadiad-Modasa Road) and along Old… — forest land use approved
3 Adani Total Gas projects in Kheda
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.