Quick answers
What is this project?
Electrification (load Extention) work of Kamandal Kund in Girnar Hill is a lapsed power project in Girnar Hills, Junagadh, Gujarat. The site covers 0.3 acres.
Who is building it?
The applicant is Pgvcl Junagadh.
Has it been approved?
No. The application was lapsed on 16 Apr 2026, so it is no longer under consideration.
Where is it?
In Girnar Hills, Junagadh, Gujarat.
How big is it?
It has a stated cost of ₹35 lakh; a site of 0.3 acres and 590 m² of forest land.
When was it filed?
The application was filed on 29 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Electrification (load Extention) work of Kamandal Kund in Girnar Hill
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 29 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Pgvcl Junagadh |
| Land area | 1,100 m² |
| Forest land | 590 m² |
| Project cost | ₹35 lakh |
| Village / locality | Girnar Hills |
| Taluk / tehsil | Junagadh |
| District | Junagadh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-13992 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Dec 2025 (this page) | Lapsed | 0.3 acres | ₹35 lakh |
| New project filed 29 Dec 2025 | More information requested | 0.3 acres | ₹35 lakh |
In context
24 applications in Junagadh since January 2022 are in the same category (Power): 1 approved, 9 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 67% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Girnar Hills, Junagadh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Electrification (load Extention) work of Kamandal Kund in Girnar Hill — more information requested, 0 m away
- Electrification Work From Ambaji to Kamandal Kund by Xlpe Cable — more information requested, 50 m away
- Electrification Work From Ambaji to Kamandal Kund by Xlpe Cable — lapsed, 50 m away
- Girnar Water Supply Scheme (Hasnapur Dam to Ambaji Temple on Girnar Hill) — more information requested, 300 m away
- Electrification of Datatre Tample in Girnar Hill by Overhead Lt Single Phase… — lapsed, 350 m away
- Electrification of Datatre Tample in Girnar Hill by Overhead Lt Single Phase… — more information requested, 350 m away
- Electrification work of Guru Dattatrey Temple in Girnar Hill — lapsed, 400 m away
- Electrification work of Guru Dattatrey Temple in Girnar Hill — more information requested, 400 m away
More from Pgvcl Junagadh in Junagadh
- Electrification for new connection of Katara Vipulbhai Dayabhai — lapsed
- Electrification for new connection of Katara Vipulbhai Dayabhai — more information requested
- Electrification work of Bharatvan Ashram in Girnar Hill — more information requested
- Electrification work of Guru Dattatrey Temple in Girnar Hill — lapsed
- Electrification work of Guru Dattatrey Temple in Girnar Hill — more information requested
- Electrification work of Bharatvan Ashram in Girnar Hill — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.