Quick answers
What is this project?
Railway Over Bridge in Lieu of Lc No. 9b of Kalol- Gandhinagar Bg Section at Railway Km 16/1, -2 Between Kolavada-Gandhinagar Station on Gandhinagar-Mansa Road is a proposed road project in Pethapur, Gandhinagar, Gujarat. The site covers 5.9 acres.
Who is building it?
The applicant is Executive Engineer Capital Division Gandhinagar.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pethapur, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹60 crore; a site of 5.9 acres and 6.2 acres (2.5 ha) of forest land.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Official title | Construction of Railway Over Bridge in Lieu of Lc No. 9b of Kalol- Gandhinagar Bg Section at Railway Km 16/1, -2 Between Kolavada-Gandhinagar Station on Gandhinagar-Mansa Road. |
|---|---|
| Status | More information requested |
| Status since | 20 Nov 2026 |
| Application filed | 5 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Capital Division Gandhinagar |
| Land area | 5.9 acres (2.4 ha) |
| Forest land | 6.2 acres (2.5 ha) |
| Project cost | ₹60 crore |
| Village / locality | Pethapur |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14020 |
In context
14 applications in Gandhinagar since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. At 5.9 acres, this one is smaller than 73% of them.
51 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pethapur, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rivera Heights — under environmental review, 250 m away
- Rivera Heights — environmental approval granted, 250 m away
- Rivera Heights — under environmental review, 300 m away
- Proposed Residential cum Commercial project - "Bansari Skyview" — environmental approval granted, 550 m away
- Proposed Residential cum Commercial project - "Bansari Skyview" — environmental approval granted, 550 m away
- "shreeji Sarvasva" — environmental approval granted, 600 m away
- "shreeji Sarvasav — environmental approval granted, 600 m away
- Shivalay Sky — environmental approval granted, 850 m away
More from Executive Engineer Capital Division Gandhinagar in Gandhinagar
- Diversion of Protected Forest Land for Widening of Naroda - Dehgam Road… — more information requested
- Diversion of Protected Forest for widening of Balva Gozaria Road (SH-71) in… — more information requested
- Diversion of Protected Forest Land for Four Laning of Dehgam-Bayad Road… — more information requested
- Diversion of Protected Forest land for widening of Mansa – Pilvai Road, Ta.… — more information requested
- Diversion of Protected Forest Land for Widening of existing Ahmedabad -… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.