In-principle approval, conditions pendingRoads & highways · Amreli, Gujarat

33 KV S/C Transmission line Crossing SH-31 (Babra-Vasavad) road

33 KV S/C Transmission line Crossing SH-31 (Babra-Vasavad) road is a proposed road project in Vavdi, Babra, Amreli, Gujarat. The site covers 0.1 acres. Its stated project cost is ₹4 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 25 Nov 2026).

See it on the live map All projects in Amreli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusIn-principle approval, conditions pending
Status since25 Nov 2026
Application filed2 Jun 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantClean Max Zeus Private Limited
Land area500 m²
Forest land450 m²
Project cost₹4 crore
Village / localityVavdi
Taluk / tehsilBabra
DistrictAmreli
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14090

In context

37 applications in Amreli since January 2022 are in the same category (Roads & highways): 4 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 93% of them.

Where it is

Vavdi, Babra, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.