Forest land use approvedPower · Amreli, Gujarat

Grant permission of 0.0234Ha. Road side Protected Forest Land for Propose Isun Infrastructure Solar Plant 11 kv to 66 kv Gavadaka S.S on UnderGround Cable line Ta. Amreli Dist. Amreli in favor of Isun Infrastructure.

Grant permission of 0.0234Ha. Road side Protected Forest Land for Propose Isun Infrastructure Solar Plant 11 kv to 66 kv Gavadaka S.S on UnderGround Cable line Ta. Amreli Dist. Amreli in favor of Isun Infrastructure is an approved power project in Gavadka, Amreli, Gujarat. The site covers 0 acres. Its stated project cost is ₹3 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 8 Aug 2026).

See it on the live map All projects in Amreli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusForest land use approved
Status since8 Aug 2026
Application filed4 Mar 2025
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantIsun Infrastructure
Land area200 m²
Forest land230 m²
Project cost₹3 crore
Village / localityGavadka
Taluk / tehsilAmreli
DistrictAmreli
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14157

In context

18 applications in Amreli since January 2022 are in the same category (Power): 9 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0 acres, this one is smaller than 80% of them.

Where it is

Gavadka, Amreli, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.