Quick answers
What is this project?
Diversion of 0.0306 ha of protected forest land (Road side Strip Land) for stringing of Overhead conductor for 66kV S/C Kodaram-Panchda line Under "Kisan Suryoday Yojana" crossing of Vadgam-Kheralu National Highway, District: Banaskantha, State: Gujarat is a lapsed road project in Kodaram, Vadgam, Banas Kantha, Gujarat. The site covers 0 acres.
Who is building it?
The applicant is Gujarat Energy Transmission Corp LTD.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Kodaram, Vadgam, Banas Kantha, Gujarat.
How big is it?
It has a stated cost of ₹3.2 crore; a site of 0 acres and 310 m² of forest land.
When was it filed?
The application was filed on 21 Sept 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 21 Sept 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 100 m² |
| Forest land | 310 m² |
| Project cost | ₹3.2 crore |
| Village / locality | Kodaram |
| Taluk / tehsil | Vadgam |
| District | Banas Kantha |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14188 |
In context
50 applications in Banas Kantha since January 2022 are in the same category (Roads & highways): 1 approved, 32 filed or under review, and 17 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kodaram, Vadgam, Banas Kantha, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0099 Ha Protected Forest land for laying of Proposed 11 KV HT… — forest land use approved, 1.5 km away
- Nani Hirvani to Palanpur — more information requested, 5.2 km away
- Chaudhary Sanjaykumar Virsangbhai — initial checks, 5.3 km away
- Shri Krunal N Patel (Bhakhari Ordinary Sand Block - C) — under environmental review, 5.5 km away
- Shri Krunal N Patel (Bhakhari Ordinary Sand Block - D) — under environmental review, 5.6 km away
- Shri Sureshkumar K. Patel, Lease Area- 02.00.00 Hect — environmental approval granted, 6.4 km away
- Mr. Chavda Arvind JesangbhaiN Proposed Mining of BHAKHARI ORDINARY SAND-… — lapsed, 6.4 km away
- Shri Sureshkumar K. Patel, Lease Area- 01.88.00 Hect — environmental approval granted, 6.5 km away
More from Gujarat Energy Transmission Corp LTD in Banas Kantha
- Diversion of 10.2084 Ha. Protected Area (Balaram-Ambaji Wildlife Sanctuary)… — more information requested
- Diversion of 10.4640 Ha. Reserved Forest land to be used for work of 66 KV S/C… — under forest review
- Diversion of 11.4336 Ha. Reserved Forest land to be used for work of 66 KV S/C… — more information requested
- Diversion of 11.4336 Ha. Reserved Forest land to be used for work of 66 KV S/C… — lapsed
- Construction of New 66KV Substation — not approved
- Diversion of 0.0648 ha of protected forest land (Road side Strip Land) for… — lapsed
10 Gujarat Energy Transmission Corp projects in Banas Kantha
All 231 Gujarat Energy Transmission Corp projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.