Quick answers
What is this project?
Diversion of 3.1629 Hectares of Reserved Forest Land for Construction and Improvement of Various Roads. 1. Tana-Piparla road 0.8056 Ha. 2. Ghanghli-Bhangadh-Paliyad road 0.8480 Ha. 3. Mota Khokhra- Bhandariya road 1.5093 is a proposed road project in Thala, Sihor, Bhavnagar, Gujarat. The site covers 7.8 acres.
Who is building it?
The applicant is Exicutive Engineer.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Thala, Sihor, Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹12 crore; a site of 7.8 acres and 7.8 acres (3.2 ha) of forest land.
When was it filed?
The application was filed on 7 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 7 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Exicutive Engineer |
| Land area | 7.8 acres (3.2 ha) |
| Forest land | 7.8 acres (3.2 ha) |
| Project cost | ₹12 crore |
| Village / locality | Thala |
| Taluk / tehsil | Sihor |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14249 |
In context
9 applications in Bhavnagar since January 2022 are in the same category (Roads & highways): 1 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thala, Sihor, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri N.G Parmar Rabarika Block- J — environmental approval granted, 2.3 km away
- Shri N.G Parmar Rabarika Block- J — cleared for impact study, 2.3 km away
- Shri Parmar Sanjaysinh H. Rabarika Block- H — environmental approval granted, 2.4 km away
- Shri Parmar Sanjaysinh H. Rabarika Block- H — cleared for impact study, 2.4 km away
- Shri N.G Parmar Rabarika Block- I — environmental approval granted, 2.5 km away
- Shri N.G Parmar Rabarika Block- I — cleared for impact study, 2.5 km away
- Shri Devendrasinh M Zala Block- F — cleared for impact study, 2.5 km away
- Parmar Sanjaysinh H. Rabarika Block-G — environmental approval granted, 2.5 km away
More from Exicutive Engineer in Bhavnagar
- Diversion of 0.6210 Hectares of Reserved Forest Land for Construction and… — more information requested
- Construction & Improvement of Tana -Piparla road — lapsed
- Construction & Improvement of Ghanghali Bhangadh Paliyad road — lapsed
- Mota Khokhra- Melakadi Road — lapsed
- Construction of Motakhokhara Bhandariya Road Km 2/20-9/6 — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.