Pipeline from Tap Off Ex. GSPL Pipeline to Proposed Plot of MSIL in Taluka Dasada

Pipeline from Tap Off Ex. GSPL Pipeline to Proposed Plot of MSIL in Taluka Dasada is a lapsed pipeline project in Naviyani, Dasada, Surendranagar, Gujarat. The site covers 0.2 acres. Its stated project cost is ₹5.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Apr 2026).

See it on the live map All projects in Surendranagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Pipeline from Tap Off Ex. GSPL Pipeline to Proposed Plot of MSIL in Taluka Dasada is a lapsed pipeline project in Naviyani, Dasada, Surendranagar, Gujarat. The site covers 0.2 acres.

Who is building it?

The applicant is Gujarat State Petronet LTD.

Has it been approved?

No. The application was lapsed on 29 Apr 2026, so it is no longer under consideration.

Where is it?

In Naviyani, Dasada, Surendranagar, Gujarat.

How big is it?

It has a stated cost of ₹5.2 crore; a site of 0.2 acres and 720 m² of forest land.

When was it filed?

The application was filed on 11 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Pipeline from Tap Off Ex. GSPL Pipeline to Proposed Plot of MSIL in Taluka Dasada

Project details

Official titlePipeline from Tap Off Ex. GSPL Pipeline to Proposed Plot of MSIL in Taluka Dasada in Surendranagar District.
StatusLapsed
Status since29 Apr 2026
Application filed11 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantGujarat State Petronet LTD
Land area700 m²
Forest land720 m²
Project cost₹5.2 crore
Village / localityNaviyani
Taluk / tehsilDasada
DistrictSurendranagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14268

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Mar 2024More information requested0.2 acres₹5.2 crore
New project filed 11 Sept 2023 (this page)Lapsed0.2 acres₹5.2 crore

In context

26 applications in Surendranagar since January 2022 are in the same category (Pipelines): 16 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.2 acres, this one is smaller than 78% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Naviyani, Dasada, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.