One of 2 filings for this project. The project's main page, with every filing and where each stands: Jambughoda 4G Saturation USOF Project VVIP Cases
Project details
| Status | More information requested |
|---|---|
| Status since | 4 May 2026 |
| Application filed | 7 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 600 m² |
| Forest land | 600 m² |
| Project cost | ₹4 crore |
| Village / locality | Gondhara |
| Taluk / tehsil | Jambughoda |
| District | Panch Mahals |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14314 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Feb 2025 (this page) | More information requested | 0.1 acres | ₹4 crore |
| New project filed 7 Feb 2025 | Decision issued | 0.1 acres | ₹4 crore |
In context
17 applications in Panch Mahals since January 2022 are in the same category (Telecom): 4 approved, 2 filed or under review, and 10 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 85% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gondhara, Jambughoda, Panch Mahals, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jambughoda 4G Saturation USOF Project VVIP Cases — decision issued, 0 m away
- Proposal of Protected Area (Jambughoda Wildlife Sanctuary ) for the New ESR… — more information requested, 2.3 km away
- Proposal of Protected Area (Jambughoda Wildlife Sanctuary ) for the New ESR… — lapsed, 2.3 km away
- Proposal of Protected Area (Jambughoda Wildlife Sanctuary) for the U/G Water… — lapsed, 4 km away
- Proposal of Protected Area (Jambughoda Wildlife Sanctuary) for the U/G Water… — more information requested, 4 km away
- BSNL 4G sites-OFC laying permission for Godhra SSA — lapsed, 7 km away
- BSNL 4G sites-OFC laying permission for Godhra SSA — more information requested, 7 km away
- BSNL 4G sites-OFC laying permission for Godhra SSA — lapsed, 7 km away
More from Mahesh Nair in Panch Mahals
- 4G Saturation USOF project Achhala Village — forest land use approved
- BSNL 4G sites-OFC laying permission for Godhra SSA — lapsed
- BSNL 4G sites-OFC laying permission for Godhra SSA — more information requested
- Vadodara WL 4G Saturation project — lapsed
- BSNL 4G Saturation Project Godhra SSA for Wildlife land diversion for BTS… — forest land use approved
- BSNL 4G Saturation Project Godhra SSA for Wildlife land diversion for BTS… — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.