What is Developing? Open the mapMap

Forest land use approvedPower · Tapi, Gujarat

FCA Permission - laying 11KV three (3-Nos.) Power Cable Transmission Line on SH–80 (Velda-Nijhar), Taluka Nijhar, Dist- Tapi, on route from 11KV Cables from KPIGEL Solar Pooling Sub-Station to GETCO 66 KV Nijhar, Dist-Tapi- Diversion of Protected Forest Area: 0.0472 Ha

FCA Permission - laying 11KV three (3-Nos.) Power Cable Transmission Line on SH–80 (Velda-Nijhar), Taluka Nijhar, Dist- Tapi, on route from 11KV Cables from KPIGEL Solar Pooling Sub-Station to GETCO 66 KV Nijhar, Dist-Tapi- Diversion of Protected Forest Area: 0.0472 Ha is an approved power project in Nijhar, Nizar, Tapi, Gujarat. The site covers 0.1 acres. Its stated project cost is ₹5 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 2 Apr 2025).

See it on the live map All projects in Tapi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

FCA Permission - laying 11KV three (3-Nos.) Power Cable Transmission Line on SH–80 (Velda-Nijhar), Taluka Nijhar, Dist- Tapi, on route from 11KV Cables from KPIGEL Solar Pooling Sub-Station to GETCO 66 KV Nijhar, Dist-Tapi- Diversion of Protected Forest Area: 0.0472 Ha is an approved power project in Nijhar, Nizar, Tapi, Gujarat. The site covers 0.1 acres.

Who is building it?

The applicant is Kpi Green Energy Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 2 Apr 2025), as of 27 Nov 2026.

Where is it?

In Nijhar, Nizar, Tapi, Gujarat.

How big is it?

It has a stated cost of ₹5 lakh; a site of 0.1 acres and 470 m² of forest land.

When was it filed?

The application was filed on 1 Dec 2024.

Project details

StatusForest land use approved
Status since2 Apr 2025
Application filed1 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantKpi Green Energy Limited
Land area500 m²
Forest land470 m²
Project cost₹5 lakh
Village / localityNijhar
Taluk / tehsilNizar
DistrictTapi
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-14327

In context

11 applications in Tapi since January 2022 are in the same category (Power): 2 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Nijhar, Nizar, Tapi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Kpi Green Energy Limited in Tapi

All 37 Kpi Green Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.